INVESTIGATION OF SEPARATED GAS PASSES IN TPP-200 BOILER AT SLAVYANSK CENTRAL POWER-STATION DURING COMBUSTION OF ANTHRACITE FINES

被引:0
|
作者
NAZARENKO, VS
ROZENGAUZ, IN
BEREZINETS, PA
PETRENKO, AP
SUROVOV, AE
UTKIN, VS
BEREZINETS, AA
MIKHAILOVA, AA
NOSOVA, LG
机构
[1] ALL UNION HEAT ENGN INST, MOSCOW, USSR
[2] CENT BOILER TURBINE INST, LENINGRAD, USSR
[3] CTR ELECT POWER PLANTS & NETWORKS, DONETSK, UKSSR
关键词
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
引用
收藏
页码:56 / 61
页数:6
相关论文
共 11 条
  • [1] INVESTIGATION OF GAS RECIRCULATION IN A TPP-200 BOILER AT SLAVYANSK CENTRAL POWER-STATION
    KEMELMAN, GA
    NAZARENKO, VS
    ROZENGAUZ, IN
    BEREZINETS, PA
    UTKIN, VS
    ZHADZILKO, MI
    OVCHAROV, AP
    PALEI, VN
    REZNIK, NI
    SUROVOV, AE
    THERMAL ENGINEERING, 1972, 19 (07) : 74 - 79
  • [2] INVESTIGATIONOF GAS RECIRCULATION IN A TPP-200 BOILER AT SLAVYANSK CENTRAL POWER STATION.
    Kemel'man, G.A.
    Nazarenko, V.S.
    Rozengauz, I.N.
    Berezinets, P.A.
    Utkin, V.S.
    Zhadzilko, M.I.
    Ovcharov, A.P.
    Palei, V.N.
    Reznik, N.I.
    Surovov, A.E.
    1600, (19):
  • [3] DYNAMIC CHARACTERISTICS OF REHEATER OF TPP-200 STEAM-GENERATOR OF 800 MW GENERATING UNIT AT SLAVYANSK CENTRAL POWER-STATION WITH COMBUSTION OF ANTHRACITE FINES
    BEREZINETS, PA
    BEREZINETS, AA
    KIRILLOV, GF
    BUKSHTEIN, II
    ROZENGAUZ, IN
    GOTSOTSURA, BN
    THERMAL ENGINEERING, 1975, 22 (12) : 43 - 46
  • [4] Dynamic Characteristics of the Intermediate Superheater of the TPP-200 Steam Generator of the 800 MW Power Unit of the Slavyansk Power Plant Burning Anthracite Fines.
    Berezinets, P.A.
    Berezinets, A.A.
    Kirillov, G.F.
    Bukshtein, I.I.
    Rozengauz, I.N.
    Gotsotsura, B.N.
    1600,
  • [5] ADJUSTING AND TESTING PF CLASSIFIERS IN PF PLANT OF 800 MW UNIT AT SLAVYANSK CENTRAL POWER-STATION WHEN PULVERIZING ANTHRACITE FINES
    BRUSIN, MA
    LARIONOV, VV
    KUCHEREN.PP
    THERMAL ENGINEERING, 1971, 18 (08) : 101 - &
  • [6] INVESTIGATION OF TEMPERATURE CONDITIONS OF LOWER RADIANT SECTION OF TPP-210 BOILER AT PRIDNEPROVSKAYA CENTRAL POWER-STATION
    PRZHIYAL.MM
    KOPELIOV.AM
    BEKHTEVA, GG
    SOLOMONO.VM
    GIPSHMAN, IM
    LEVINZON, VM
    THERMAL ENGINEERING, 1971, 18 (09) : 42 - &
  • [7] INVESTIGATION AND ESTIMATION OF RELIABILITY OF REHEAT LINE, 980 BY 40 MM IN DIAMETER, OF 800 MW UNIT AT SLAVYANSK CENTRAL POWER-STATION
    MAZEL, RE
    LAPPA, VA
    TALYSHEVA, II
    THERMAL ENGINEERING, 1975, 22 (10) : 15 - 19
  • [8] INVESTIGATION OF HYDRAULIC CONDITIONS IN LOWER RADIANT SECTION OF P-49 BOILER IN A 500 MW UNIT AT NAZAROVO CENTRAL POWER-STATION
    KIVINZON, LM
    MANUILOV.TP
    SURNOV, AV
    NIKITINA, LV
    THERMAL ENGINEERING, 1971, 18 (09) : 110 - &
  • [9] STARTING METHODS FOR GAS-FIRED AND OIL-FIRED BOILER-TURBINE UNITS 800 MW IN CAPACITY AT UGLEGORSK CENTRAL POWER-STATION
    AVRUTSKII, GD
    DOVERMAN, GI
    OSTROVETSKII, RM
    PLOTKIN, ER
    SHMUKLER, BI
    GOMBOLEVSKII, VI
    GONOBOBLEV, AS
    KRASANTSOV, VN
    MATUSHEVSKII, EV
    NAKHIMOV, VI
    SKOPYLATOV, VM
    TUPIKIN, AA
    THERMAL ENGINEERING, 1981, 28 (09) : 527 - 530
  • [10] Expert test results of the TPP-312A Boiler at the Zuev District Power Station during the combustion of the GSSh grade coal with adding the RA-GEN-F Anaklarid
    Tupitsyn S.P.
    Sokolov V.V.
    Chebakova G.F.
    Kharchenko A.V.
    Chetverikov A.N.
    Thermal Engineering, 2014, 61 (3) : 229 - 235