Study of effect on pile foundation of Guomao Bridge induced by Guomao Metro Station construction at swerve

被引:0
|
作者
Wu Bo [1 ]
Liu Wei-ning [2 ]
Suo Xiao-ming [3 ]
Shi Yu-xin [3 ]
机构
[1] Fourth Engn Grp Co Ltd, China Railway, Hefei 230023, Anhui, Peoples R China
[2] Beijing Jiaotong Univ, Sch Civil & Architectural Engn, Beijing 100044, Peoples R China
[3] Third Survey & Design Inst Railway, Tianjin 300142, Peoples R China
关键词
urban metro station construction; interaction of pile-soil; ABAQUS;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In light of the Guomao Metro Station of Beijing Metro line 10, and using ABAQUS software, the construction process and construction effect on the adjacent pile foundation19-1 of Guomao Bridge are simulated; and the deformation and force character of pile foundation as well as the interaction mechanism of pile-soil are studied. The partial results acquired by simulation and measurement are compared; and a mass of harvest is achieved. The conclusions are reached that pile foundation19-1 of Guomao Bridge is safe during construction; and existing construction; project is reliable. The basis and guidance are provided for succedent Guomao Metro Station and similar engineering construction.
引用
收藏
页码:1904 / 1908
页数:5
相关论文
empty
未找到相关数据