共 50 条
[33]
STATEMENTS ON THE INSTATIONARY BEHAVIOR OF THE WATER STEAM CYCLE OF A HEAT AND POWER-STATION
[J].
BRENNSTOFF-WARME-KRAFT,
1991, 43 (05)
:271-275
[35]
Distribution of Specific Steam Loads in Tube Bundles of Condensers for Cogeneration Steam Turbines
[J].
Thermal Engineering,
2022, 69
:785-791
[38]
STEAM-GENERATOR REPLACEMENT AT SURRY POWER-STATION - ALARA ASPECTS
[J].
TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY,
1981, 39
:824-824
[40]
COST SEPARATION OF STEAM AND ELECTRICITY FOR A DUAL-PURPOSE POWER-STATION
[J].
COMBUSTION,
1973, 44 (08)
:6-14