AN ITERATIVE SCHEDULING TECHNIQUE FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING

被引:173
作者
LI, KY
WILLIS, RJ
机构
[1] Department of Business Systems, Monash University, Clayton
关键词
PROJECT; SCHEDULING; HEURISTIC;
D O I
10.1016/0377-2217(92)90320-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a new procedure for scheduling projects where the availability of resources is constrained. Under the procedure, a project is scheduled forwards and backwards iteratively until there is no further improvement in the project completion time. During the iterative process, successive improvements on the project completion time are achieved through the incorporation of the merits of a backward schedule into its succeeding forward schedule. Backward scheduling has the merits of using resources as late as possible and thus keeps project financing down. Thus the method attempts to produce schedules that are both short and cheap. A series of comparative tests is conducted to evaluate the effectiveness of the model. The test results indicate that the new procedure outperforms the chosen heuristic rules, and also demonstrates that it can generate near-optimal schedules.
引用
收藏
页码:370 / 379
页数:10
相关论文
共 10 条
[1]  
Davis E. W., 1973, AIIE T, V5, P297
[2]  
GUPTA SK, 1985, PROJECT MANAGEMENT M, P293
[3]  
HOOPER PC, 1965, 3RD ANN CPA STUDY GR
[4]  
MEREDITH JR, 1985, PROJECT MANAGEMENT M
[5]  
Moder J. J., 1983, PROJECT MANAGEMENT C
[6]  
NAFICI F, 1976, THESIS U LEEDS
[7]  
PLEBANI LJ, 1981, PRODUCTION INVENTORY, V22, P65
[9]   CRITICAL PATH-ANALYSIS AND RESOURCE CONSTRAINED PROJECT SCHEDULING - THEORY AND PRACTICE [J].
WILLIS, RJ .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1985, 21 (02) :149-155
[10]  
WILLIS RJ, 1983, ASOR B, V3, P5