THE SCHEDULING OF ACTIVITIES TO MAXIMIZE THE NET PRESENT VALUE OF PROJECTS - COMMENT

被引:10
作者
SEPIL, C
机构
[1] Middle East Technical University
关键词
ACTIVITY NETWORKS; SCHEDULING;
D O I
10.1016/0377-2217(94)90161-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In a recent paper, Elmaghraby and Herroelen have presented an algorithm to maximize the present value of a project. Here, with the help of an example, it is shown that the algorithm may not find the optimal solution.
引用
收藏
页码:185 / 187
页数:3
相关论文
共 1 条
[1]   THE SCHEDULING OF ACTIVITIES TO MAXIMIZE THE NET PRESENT VALUE OF PROJECTS [J].
ELMAGHRABY, SE ;
HERROELEN, WS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :35-49