Multi-objective metaheuristics for solving a type II robotic mixed-model assembly line balancing problem

被引:54
作者
Rabbani, Masoud [1 ]
Mousavi, Zahra [1 ]
Farrokhi-Asl, Hamed [2 ]
机构
[1] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
[2] Iran Univ Sci & Technol, Sch Ind Engn, Tehran, Iran
关键词
Robotic mixed-model assembly line balancing; mixed-integer linear programming; U-shaped assembly line; multiobjective optimization;
D O I
10.1080/21681015.2015.1126656
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Nowadays, robots are used extensively in robotic assembly line balancing system because of the capabilities of the robots. Robotic assembly lines are used to manufacture high volume product in customization and specialization production. In this paper, type II robotic mixedmodel assembly line balancing is considered. The goals are to minimize robot purchasing costs, robot setup costs, sequence dependent setup costs, and cycle time. The proposed model tries to determine an optimal or near-optimal configuration of tasks, workstations in U-shaped assembly line balancing. In this model, two types of tasks including the special task for one product model and the common task for several products models exist. The problem with the aforementioned conditions is NP-hard problem. So, we used two different multi-objective evolutionary algorithms (MOEAs) to solve the problem. First algorithm is non-dominated sorting genetic algorithm (NSGA-II) and the second one is multi-objective particle swarm optimization (MOPSO). Also, we used GAMS software to solve the problem in small size problem to validate our proposed model. Then, some numerical examples are presented and the experimental results and the performance of the algorithms are compared with each other.
引用
收藏
页码:472 / 484
页数:13
相关论文
共 28 条
[1]   Balancing of robotic mixed-model two-sided assembly line with robot setup times [J].
Aghajani, Mojtaba ;
Ghodsi, Reza ;
Javadi, Babak .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 74 (5-8) :1005-1016
[2]  
[Anonymous], 1995, P ICNN 95 INT C NEUR, DOI DOI 10.1109/ICNN.1995.488968
[3]   Design of flexible assembly line to minimize equipment cost [J].
Bukchin, Joseph ;
Tzur, Michal .
IIE Transactions (Institute of Industrial Engineers), 2000, 32 (07) :585-598
[4]   Handling multiple objectives with particle swarm optimization [J].
Coello, CAC ;
Pulido, GT ;
Lechuga, MS .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2004, 8 (03) :256-279
[5]   Solving a robotic assembly line balancing problem using efficient hybrid methods [J].
Daoud, Slim ;
Chehade, Hicham ;
Yalaoui, Farouk ;
Amodeo, Lionel .
JOURNAL OF HEURISTICS, 2014, 20 (03) :235-259
[6]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197
[7]   An efficient approach for type II robotic assembly line balancing problems [J].
Gao, Jie ;
Sun, Linyan ;
Wang, Lihua ;
Gen, Mitsuo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (03) :1065-1080
[8]  
Kennedy J., 1995, P 6 INT S MICR HUM S, P39, DOI DOI 10.1109/MHS.1995.494215
[9]   Statistical procedures for task assignment and robot selection in assembly cells [J].
Khouja, M ;
Booth, DE ;
Suh, M ;
Mahaney, JK .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2000, 13 (02) :95-106
[10]   A STRONG CUTTING PLANE ALGORITHM FOR THE ROBOTIC ASSEMBLY-LINE BALANCING PROBLEM [J].
KIM, H ;
PARK, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (08) :2311-2323