HORIZONTAL SLIM-HOLE DRILLING WITH COILED TUBING - AN OPERATORS EXPERIENCE

被引:8
作者
RAMOS, AB
FAHEL, RA
CHAFFIN, MG
PULIS, KH
机构
来源
JOURNAL OF PETROLEUM TECHNOLOGY | 1992年 / 44卷 / 10期
关键词
D O I
10.2118/23875-PA
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
What is believed to be the first horizontal well drilled with directionally controlled coiled tubing recently was completed in the Austin Chalk formation. An existing well was sidetracked out of 4 1/2-in. casing with a conventional whipstock. An average build rate of 15-degrees/ 100 ft was achieved in the curve, and a 1,458-ft vertical section was drilled with 2-in. coiled tubing, downhole mud motors, wireline steering tools, a mechanical downhole orienting tool, and 3 7/8-in. bits. This paper discusses the orienting and directional tools and techniques developed during this operation. It also describes improvements made for the second well.
引用
收藏
页码:1119 / 1125
页数:7
相关论文
共 1 条
[1]  
Fultz J.D., 1990 SPE ANN TECHN C