共 17 条
[1]
BIRNBAUM BH, 1985, JUN WORKSH ORG UN ED, P27
[2]
CALLOWAY TM, 1985, OCT P IEEE PV SPEC C, P280
[3]
DEALMEIDA AT, 1983, IEEE T POWER AP SYST, V102, P1515, DOI 10.1109/TPAS.1983.317879
[4]
KRUMPELT M, 1983, 18TH P INT EN CONV E, P1619
[5]
LOAD-FOLLOWING AND SPINNING-RESERVE PENALTIES FOR INTERMITTENT GENERATION
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1981, 100 (03)
:1203-1211
[6]
MICKAL H, 1983, 5TH P EC PHOT C, P490
[7]
NAGASHIMA M, 1985, NEDO R D PROGRAM FUE
[8]
PAYNE PE, 1979, 14TH P EN CONV ENG C, P251
[9]
RACINE WC, 1983, 18TH P INT EN CONV E, P1599
[10]
RAHMAN S, 1985 P INT C SOL WIN