An Empirical Study on Stakeholder Management of Post-disaster Reconstruction Based on Interpretation System

被引:1
作者
Zhou, Jun [1 ]
Wang, Hanzhao [1 ]
机构
[1] Cent Univ Finance & Econ, Shanghai, Peoples R China
来源
JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM | 2015年 / 8卷 / 05期
关键词
post-disaster reconstruction; project management; stakeholder management; interpretation system;
D O I
10.3926/jiem.1468
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose: Recently natural disasters frequently occur all over the world. However, the stakeholder management of post-disaster reconstruction is often a neglected field because of its particularity. This study investigates a model of stakeholder management for managers in post-disaster reconstruction project. Design/methodology/approach: Based on the interpretation system model, this study makes a deep analysis of the stakeholder management of post-disaster reconstruction with the case of reconstruction project in Wenchuan. Findings: The results reveal that the managers should take divergent actions to collect data of stakeholders in different situations. The discovering mode is suitable in a simple stakeholder environment and the undirected viewing mode is suitable in a relatively complex environment. Practical implications: This paper establishes a scientific archived management report of the stakeholders in Wenchuan reconstruction project to provide the suggestions and the experiences for the future projects Originality/value: Past stakeholder management models are not suitable in reconstruction project because of its particularity. This study takes interpretation system as a new model for stakeholder management in reconstruction project, allowing managers to take the optimal actions in different stakeholder environment.
引用
收藏
页码:1409 / 1427
页数:19
相关论文
共 22 条
  • [1] Response strategies to stakeholder pressures in global projects
    Aaltonen, Kirsi
    Sivonen, Risto
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (02) : 131 - 141
  • [2] Achterkamp Marjolein C., 2008, International Journal of Project Management, V26, P749, DOI 10.1016/j.ijproman.2007.10.001
  • [3] Project relationship management and the Stakeholder Circle(TM)
    Bourne, Lynda
    Walker, Derek H. T.
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2008, 1 (01) : 125 - 130
  • [4] Donor-driven resource procurement for post-disaster reconstruction: Constraints and actions
    Chang, Yan
    Wilkinson, Suzanne
    Potangaroa, Regan
    Seville, Erica
    [J]. HABITAT INTERNATIONAL, 2011, 35 (02) : 199 - 205
  • [5] Crane A., 2011, J BUS ETHICS, V102, P77, DOI [10.1007/s10551-011-1191-4, DOI 10.1007/S10551-011-1191-4]
  • [6] TOWARD A MODEL OF ORGANIZATIONS AS INTERPRETATION SYSTEMS
    DAFT, RL
    WEICK, KE
    [J]. ACADEMY OF MANAGEMENT REVIEW, 1984, 9 (02) : 284 - 295
  • [7] From Market Orientation to Stakeholder Orientation
    Ferrell, O. C.
    Gonzalez-Padron, Tracy L.
    Hult, G. Tomas M.
    Maignan, Isabelle
    [J]. JOURNAL OF PUBLIC POLICY & MARKETING, 2010, 29 (01) : 93 - 96
  • [8] Floricel S., 2001, INT J PROJ MANAG, V19, P445, DOI [DOI 10.1016/S0263-7863(01)00047-3, 10.1016/S0263-7863(01)00047-3]
  • [9] Allocation of post-disaster reconstruction financing to housing
    Freeman, PK
    [J]. BUILDING RESEARCH AND INFORMATION, 2004, 32 (05) : 427 - 437
  • [10] A Study of Determinant Factors of Stakeholder Environmental Pressure Perceived by Industrial Companies
    Gonzalez-Benito, Javier
    Gonzalez-Benito, Oscar
    [J]. BUSINESS STRATEGY AND THE ENVIRONMENT, 2010, 19 (03) : 164 - 181