SCHEDULING THE PRODUCTION OF SEVERAL ITEMS WITH RANDOM DEMANDS IN A SINGLE FACILITY

被引:74
作者
GALLEGO, G
机构
关键词
LOT SIZING; PRODUCTION SCHEDULING; OPTIMAL CONTROL; RANDOM DEMANDS;
D O I
10.1287/mnsc.36.12.1579
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Consider the problem of scheduling the production of several items in a single facility that can produce only one item at a time. This problem occurs since it is often economic to produce several items in a single facility. The objective is to reduce the long run average holding, backorder and setup costs. We assume that demands are random with constant expected rates. We allow backorders and charge holding and backlogging costs at linear time weighted rates. Items are produced at continuous constant rates. Setup times and setup costs are item dependent constants. These parameters, however, are independent of the order of setups. A real-time scheduling tool is developed in three steps. First, with demands replaced by their expectations, we compute an optimal or near-optimal target cyclic schedule. Next, we study the problem of scheduling the facility after a single disruption perturbs the inventories. The goal is to recover the target cyclic schedule at minimal excess over the average cost of the cyclic schedule. We formulate this as a control problem and obtain a linear recovery policy that is optimal for a large configuration of disruptions. Finally, we select safety stocks to minimize the long run average cost of following the target schedule with the recovery policy. We show that optimal safety stocks are unique and have the property that in the long run the proportion of time that an item is in stock is the ratio of backorder to holding plus backorder cost. We present an example that integrates the cyclic schedule, the control policy and the safety stocks.
引用
收藏
页码:1579 / 1592
页数:14
相关论文
共 26 条
[1]  
ARKIN E, 1988, 822 CORN U SCH OP RE
[2]  
AXSATER S, 1983, EXTENSION EXTENDED B
[3]   THE 2-PRODUCT, SINGLE-MACHINE, STATIC DEMAND, INFINITE HORIZON LOT SCHEDULING PROBLEM [J].
BOCTOR, FF .
MANAGEMENT SCIENCE, 1982, 28 (07) :798-807
[4]   THE ECONOMIC LOT-SCHEDULING PROBLEM - ACHIEVING FEASIBILITY USING TIME-VARYING LOT SIZES [J].
DOBSON, G .
OPERATIONS RESEARCH, 1987, 35 (05) :764-771
[5]  
DOBSON G, 1988, CYCLIC LOT SCHEDULIN
[6]   OPTIMAL LINEAR REGULATORS - DISCRETE-TIME CASE [J].
DORATO, P ;
LEVIS, AH .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1971, AC16 (06) :613-+
[7]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[8]   APPLICATION OF MARGINAL ANALYSIS TO THE ECONOMIC LOT SCHEDULING PROBLEM [J].
FUJITA, S .
AIIE TRANSACTIONS, 1978, 10 (04) :354-361
[9]  
GALLEGO G, 1989, MULTIPLE PRODUCT SIN
[10]  
GALLEGO G, 1988, 769 CORN U SCH OP RE