共 12 条
[1]
AXSATER S, 1976, PRODUKTIONSEKONOMI
[2]
AXSATER S, 1977, 34 LINK I TECHN DEP
[3]
Berry W. L., 1972, PRODUCTION INVENTORY, V13, P19
[4]
Clarke C., 1964, OPER RES, V12, P568, DOI DOI 10.1287/OPRE.12.4.568
[7]
LASDON LS, 1968, OPER RES, V19, P946
[9]
MULTI-ITEM LOT SIZE SCHEDULING BY HEURISTIC .1. WITH FIXED RESOURCES
[J].
MANAGEMENT SCIENCE SERIES B-APPLICATION,
1975, 21 (10)
:1186-1193
[10]
SILVER EA, 1973, PRODUCTION INVENTORY, V14, P64