共 50 条
- [42] An Optimization Model for the Control of Complex Turnkey Projects in Plant Engineering 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 874 - 878
- [44] Complex, complicated, chaotic? The control of construction projects with artificial intelligence BAUINGENIEUR, 2018, 93 : A3 - A3
- [45] Enacting clan control in complex IT projects: A social capital perspective MIS Quarterly: Management Information Systems, 2012, 36 (02): : 577 - 600
- [46] Improvements of the traffic signal control by complex-valued Hopfield networks 2006 IEEE INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORK PROCEEDINGS, VOLS 1-10, 2006, : 459 - +
- [49] A framework for developing portfolios of improvements projects in manufacturing FORTY SIXTH CIRP CONFERENCE ON MANUFACTURING SYSTEMS 2013, 2013, 7 : 377 - 382