共 50 条
- [41] Bidder entitled to preparation cost but not profits CIVIL ENGINEERING, 2000, 70 (12): : 70 - 70
- [43] Reduction of jobs and asset development NACHRICHTEN AUS DER CHEMIE, 2005, 53 (12) : 1266 - 1266
- [47] A low-cost automatic acquisition system for photogrammetry 2021 IEEE INTERNATIONAL INSTRUMENTATION AND MEASUREMENT TECHNOLOGY CONFERENCE (I2MTC 2021), 2021,
- [49] Protecting HRP UWB Ranging System Against Distance Reduction Attacks PROCEEDINGS OF THE 2023 ACM SIGSAC CONFERENCE ON COMPUTER AND COMMUNICATIONS SECURITY, CCS 2023, 2023, : 622 - 635
- [50] Automatic Intrusion Response System Based on Aggregation and Cost 2008 INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION, VOLS 1-4, 2008, : 1783 - +