Optimizing the branch number and branch length of radial drilling in high water cut low permeability reservoirs

被引:1
作者
Wang, Xiu-Kun [1 ]
Cui, Chuan-Zhi [1 ]
机构
[1] China Univ Petr East China, Qingdao, Peoples R China
关键词
Radial drilling; High water cut; Low permeability; Equilibrium displacement;
D O I
10.1007/s13202-015-0178-6
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Radial drilling, also called ultra-short horizontal well, is a new kind stimulation technology, which can be used both in new and old wells to improve the productivity and oil recovery effectively. For the low permeability reservoirs, it had been widely used in practice to effectively solve the unbalanced displacement problems for the waterflooded reservoirs. Applying the multi-layer equilibrium displacement principle, the model of optimizing the radial drilling branch number and length for the high water cut low permeability reservoirs is established, and the corresponding programs are also compiled. Using the reservoir numerical simulation technology, this model is proved to be valid and accurate. This optimization method has been applied in Bonan fifth reservoir of Shengli oilfield, which exhibits quite positive results: higher average production rate and lower average water cut of the radial drilled wells.
引用
收藏
页码:177 / 183
页数:7
相关论文
共 10 条
  • [1] Abdel-Ghany MA, 2011, RAD DRILL PETR 1 WEL
  • [2] Bruni MA, 2007, LAT AM CAR PETR ENG
  • [3] [崔传智 Cui Chuanzhi], 2012, [油气地质与采收率, Petroleum Geology and Recovery Efficiency], V19, P94
  • [4] Dickinson W., 1989, SPE DRILL COMPLETE, V4, P247
  • [5] Dickinson W, 1992, SPE LAT AM PETR ENG
  • [6] Ge Jiali, 2003, MODERN RESERVOIR FLO
  • [7] Marbun B, 2011, INT PETR TECHN C
  • [8] Taraskin E, 2008, SPE RUSS OIL GAS TEC
  • [9] [杨永印 Yang Yongyin], 2006, [石油钻采工艺, Oil Drilling & Production Technology], V28, P11
  • [10] Zhaoxin L, 2001, OIL GAS UNDERGROUND, P36