V-SHAPE PROPERTY OF OPTIMAL SEQUENCE OF JOBS ABOUT A COMMON DUE DATE ON A SINGLE-MACHINE

被引:8
作者
BECTOR, CR
GUPTA, YP
GUPTA, MC
机构
[1] UNIV LOUISVILLE,SCH BUSINESS,DEPT MANAGEMENT,LOUISVILLE,KY 40292
[2] UNIV MANITOBA,DEPT ACTUARIAL & MANAGEMENT SCI,WINNIPEG R3T 2N2,MANITOBA,CANADA
[3] UNIV LOUISVILLE,DEPT IND ENGN,LOUISVILLE,KY 40292
关键词
D O I
10.1016/0305-0548(89)90043-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:583 / 588
页数:6
相关论文
共 12 条
[1]   MINIMIZING MEAN ABSOLUTE DEVIATION OF COMPLETION TIMES ABOUT A COMMON DUE DATE [J].
BAGCHI, U ;
SULLIVAN, RS ;
CHANG, YL .
NAVAL RESEARCH LOGISTICS, 1986, 33 (02) :227-240
[2]  
Baker K., 1974, INTRO SEQUENCING SCH
[3]   A COMPARISON OF DUE-DATE SELECTION-RULES [J].
BAKER, KR ;
BERTRAND, JWM .
AIIE TRANSACTIONS, 1981, 13 (02) :123-131
[4]   DETERMINATION OF AN OPTIMAL COMMON DUE DATE AND OPTIMAL SEQUENCE IN A SINGLE-MACHINE JOB SHOP [J].
BECTOR, CR ;
GUPTA, YP ;
GUPTA, MC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (04) :613-628
[5]  
CHENG TCE, 1985, ENG OPTIM, V9, P127, DOI DOI 10.1080/03052158508902508
[6]  
Conway R, 1967, THEORY SCHEDULING
[7]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[8]  
Francis RL., 1974, FACILITY LAYOUT LOCA
[9]  
FRENCH S, 1983, SEQUENCING SCHEDULIN