A TECHNIQUE FOR UNCERTAINTY REDUCTION BASED ORDER COMMONALITY

被引:18
作者
BARTEZZAGHI, E [1 ]
VERGANTI, R [1 ]
机构
[1] POLITECN MILAN,CONSORZIO MIP,I-20133 MILAN,ITALY
关键词
MASTER PRODUCTION SCHEDULING; COMMONALITY; OVERPLANNING; UNCERTAINTY REDUCTION; MAKE TO ORDER;
D O I
10.1080/09537289508930265
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The use of commonality is widely diffused as a criterion to reduce uncertainty in demand forecasts for the master production schedule (MPS). Nevertheless, studies have mostly focused on exploiting component commonality in make to stock and assemble to order manufacturing. This paper refers to planning environments with two specific characteristics. First, the degree of certainty of the demand is extremely low, due to product complexity, with poor modularization and standardization, and to the presence of few customers of large dimensions. Second, the delivery lead time is less than the total lead time. In this situation, demand for MPS planning units is extremely uncertain and sporadic. It is therefore necessary to formulate in advance forecasts of customer orders with a redundant configuration. In this paper a technique for the reduction of demand uncertainty is introduced, based on the exploitation of order commonalities. In particular, relations between order commonality and uncertainty reduction in a planning environment with such complex features are illustrated. Then, guidelines for the implementation of the technique in order to reduce over-planning in the master production schedule are provided. Finally, the performances of the technique are empirically analysed by means of both a simulation model and experimental application in a telecommunication systems manufacturer.
引用
收藏
页码:157 / 169
页数:13
相关论文
共 23 条
[1]   AGGREGATING SUBJECTIVE FORECASTS - SOME EMPIRICAL RESULTS [J].
ASHTON, AH ;
ASHTON, RH .
MANAGEMENT SCIENCE, 1985, 31 (12) :1499-1508
[2]   THE EFFECT OF COMMONALITY ON SAFETY STOCK IN A SIMPLE INVENTORY MODEL [J].
BAKER, KR ;
MAGAZINE, MJ ;
NUTTLE, HLW .
MANAGEMENT SCIENCE, 1986, 32 (08) :982-988
[3]  
Castagna R., 1992, Integrated Manufacturing Systems, V3, P15, DOI 10.1108/09576069210015865
[4]   AGGREGATE SAFETY STOCK LEVELS AND COMPONENT PART COMMONALITY [J].
COLLIER, DA .
MANAGEMENT SCIENCE, 1982, 28 (11) :1296-1303
[5]  
EVERDELL R, 1984, MASTER PRODUCTION SC
[6]   COMPONENT COMMONALITY WITH SERVICE LEVEL REQUIREMENTS [J].
GERCHAK, Y ;
MAGAZINE, MJ ;
GAMBLE, AB .
MANAGEMENT SCIENCE, 1988, 34 (06) :753-760
[7]   THE DYNAMICS OF HEDGING THE MASTER SCHEDULE [J].
GUERRERO, HH ;
BAKER, KR ;
SOUTHARD, MH .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (06) :1475-1483
[8]  
Higgins P., 1992, Production Planning and Control, V3, P2, DOI 10.1080/09537289208919369
[9]   DESIGNING A MATERIAL-REQUIREMENTS-PLANNING SYSTEM TO MEET THE NEEDS OF LOW-VOLUME, MAKE-TO-ORDER COMPANIES (WITH CASE-STUDY) [J].
HOEY, J ;
KILMARTIN, BR ;
LEONARD, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (02) :375-386
[10]   ON THE DETERMINATION OF OVERPLANNING MARGINS FOR COMPONENTS IN A CONSUMER ELECTRONICS FACTORY [J].
KAMP, APGM ;
POLDERMAN, GL ;
STRIEKWOLD, PET ;
WEEDA, PJ .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 16 (03) :183-193