GROUP SCHEDULING PROBLEM - KEY TO FLEXIBLE MANUFACTURING SYSTEMS

被引:10
|
作者
LOGENDRAN, R
机构
[1] Department of Industrial, Manufacturing Engineering Oregon State University Corvallis
关键词
D O I
10.1016/0360-8352(92)90076-V
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We present an efficient heuristic algorithm for determining the sequence which minimizes the makespan of a group scheduling problem at the first level. The problem, therefore, focuses on scheduling of parts (jobs) in a part family. In the generation of partial schedules at each iteration, a job with a high mean total processing time is given a higher priority than others. An example problem, chosen from a real world application, is used to implement the algorithmic steps. For this example, it has also been shown that the makespan determined by the proposed heuristic is smaller than that determined previously by two documented algorithms.
引用
收藏
页码:113 / 116
页数:4
相关论文
共 50 条
  • [1] GROUPING PROBLEM IN SCHEDULING FLEXIBLE MANUFACTURING SYSTEMS
    KUSIAK, A
    VANNELLI, A
    KUMAR, KR
    ROBOTICA, 1985, 3 (OCT-) : 245 - 252
  • [2] On scheduling of flexible manufacturing systems
    Wu, Xiqi
    Lou, Tong
    Wuhan Gongye Daxue Xuebao/Journal of Wuhan University of Technology, 1995, 17 (02):
  • [3] A METHOD OF FLEXIBLE SCHEDULING FOR FLEXIBLE MANUFACTURING SYSTEMS
    CHOI, JG
    HITOMI, K
    ECON, P
    ECON, PE
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 33 (1-3) : 247 - 255
  • [4] Using scheduling in flexible manufacturing systems
    McDuffie, EL
    Schneider, M
    Buoni, FB
    Shnaider, E
    Schneider, M
    MartinVega, LA
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 1995, 8 (06) : 681 - 688
  • [5] DECOMPOSITION FOR SCHEDULING FLEXIBLE MANUFACTURING SYSTEMS
    INMAN, RR
    JONES, PC
    OPERATIONS RESEARCH, 1993, 41 (03) : 608 - 617
  • [6] QUALITY IN THE SCHEDULING OF THE FLEXIBLE MANUFACTURING SYSTEMS
    Abrudan, Claudiu
    Marian, Liviu
    QUALITY AND INNOVATION IN ENGINEERING AND MANAGEMENT, 2011, : 1 - 4
  • [7] Deadlock-free genetic scheduling algorithm for flexible manufacturing systems with key resources
    Liu, Huixia
    Wu, Weimin
    Han, Xiaofei
    Yang, Hongyong
    Ma, Wenhao
    Wang, Chuang
    PROCEEDINGS OF THE 38TH CHINESE CONTROL CONFERENCE (CCC), 2019, : 1772 - 1776
  • [8] ORDERING SCHEDULING PROBLEM IN MANUFACTURING SYSTEMS
    CONTERNO, R
    HO, YC
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (09) : 1487 - 1510
  • [9] PRIORITY NETS FOR SCHEDULING FLEXIBLE MANUFACTURING SYSTEMS
    RAJU, KR
    CHETTY, OVK
    JOURNAL OF MANUFACTURING SYSTEMS, 1993, 12 (04) : 326 - 340
  • [10] Intelligent scheduling of robots and flexible manufacturing systems
    Borenstein, D
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1999, 50 (03) : 285 - 285