PLANNING AND OPERATION OF A 4-STAND TANDEM MILL

被引:0
作者
KREULITSCH, H
HIMMELBAUER, F
机构
来源
STAHL UND EISEN | 1977年 / 97卷 / 26期
关键词
D O I
暂无
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
The mathematical preliminary work for laying out the speed and throughput rate of a new tandem mill is described and the possibilities of further extension are assessed. To get an idea on the layout of the tandem mill, the machine times for rolling a medium coil were at first calculated. On the basis of some more estimated values for a medium dimension, a theoretical throughput rate and therefrom the necessary maximum rolling speed could be roughly estimated. It was found that no further increase of throughput rate could be achieved by increasing the final speed beyond certain limits.
引用
收藏
页码:1319 / 1324
页数:6
相关论文
共 4 条
[1]  
BLAND DR, 1952, J IRON STEEL I, V171, P245
[2]  
FORD H, 1951, J IRON STEEL I, V168, P57
[3]  
FORD H, 1952, J IRON STEEL I, V171, P239
[4]  
KREULITSCH H, 1976, BERG HUTTENM MH, V121, P439