Lot streaming in a two-stage assembly hybrid flow shop scheduling problem with a work shift constraint

被引:37
作者
Nejati, Mohsen [1 ]
Mahdavi, Iraj [2 ]
Hassanzadeh, Reza [3 ]
Mahdavi-Amiri, Nezam [4 ]
机构
[1] Pars Oil & Gas Co, Dept Project Planning & Control, Tehran, Iran
[2] Mazandaran Univ Sci & Technol, Dept Ind Engn, Babol Sar, Iran
[3] Univ Coll Rouzbahan, Dept Ind Engn, Sari, Iran
[4] Sharif Univ Technol, Fac Math Sci, Tehran, Iran
关键词
assembly hybrid flow shop scheduling; lot streaming; work shift; genetic algorithm; simulated annealing;
D O I
10.1080/21681015.2015.1126653
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We address the two-stage assembly scheduling problem where there are m machines at the first stage and n assembly machines at the second stage under lot sizing environment. Lot streaming (lot sizing) means breaking a lot into some sublots, where each sublot is transferred to the next machine for continuing operations. This problem can be considered as a production system model consisting of production stage and assembly stage. If different production operations are done in parallel machines independently, then the manufactured parts transferred to the next stage are assembled with purchased parts at n machines according to the operation process chart to produce the final products. Here, work-in-process inventories, work shifts, and sequence-dependent setup times are also considered as three important presumptions in order to make the problem more realistic. The objective is to minimize the sum of weighted completion times of products in each shift in order to furnish better machine utilization for the next shifts. In recent years, much effort has been made to develop good heuristics and search techniques. We propose a genetic algorithm and simulated annealing to compute the best sequence and scheduling for a two-stage assembly hybrid flow shop problem. Our numerical results demonstrate the effectiveness of the presented model and the proposed solution approach.
引用
收藏
页码:459 / 471
页数:13
相关论文
共 25 条
  • [1] Al-Anzi F. S., 2006, International Journal of Operations Research, V3, P109
  • [2] Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan
    Al-Anzi, Fawaz S.
    Allahverdi, Ali
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (09) : 2682 - 2689
  • [3] The two-stage assembly scheduling problem to minimize total completion time with setup times
    Allahverdi, Ali
    Al-Anzi, Fawaz S.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (10) : 2740 - 2747
  • [4] Baker K. R., 1978, 203 DARTM COLL AM SC
  • [5] Carter AH., 2001, CLASSICAL STAT THERM
  • [6] Lot streaming for product assembly in job shop environment
    Chan, F. T. S.
    Wong, T. C.
    Chan, L. Y.
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2008, 24 (03) : 321 - 331
  • [7] Goldratt E. M., 1984, THE RACE
  • [8] Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times
    Hatami, Sara
    Ebrahimnejad, Sadalah
    Tavakkoli-Moghaddam, Reza
    Maboudian, Yasaman
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (9-12) : 1153 - 1164
  • [9] OPTIMIZATION BY SIMULATED ANNEALING
    KIRKPATRICK, S
    GELATT, CD
    VECCHI, MP
    [J]. SCIENCE, 1983, 220 (4598) : 671 - 680
  • [10] The three-stage assembly flowshop scheduling problem
    Koulamas, C
    Kyparisis, GJ
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (07) : 689 - 704