SIMULTANEOUS MINIMIZATION OF MEAN AND VARIATION OF FLOW TIME AND WAITING TIME IN SINGLE-MACHINE SYSTEMS

被引:139
作者
BAGCHI, U
机构
关键词
D O I
10.1287/opre.37.1.118
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:118 / 125
页数:8
相关论文
共 22 条
[1]  
[Anonymous], 1967, INEQUALITIES
[2]   SCHEDULING OF A SINGLE-MACHINE TO MINIMIZE TOTAL WEIGHTED COMPLETION-TIME SUBJECT TO RELEASE DATES [J].
BIANCO, L ;
RICCIARDELLI, S .
NAVAL RESEARCH LOGISTICS, 1982, 29 (01) :151-167
[3]   SCHEDULING TO MINIMIZE WEIGHTED SUM OF COMPLETION TIMES WITH SECONDARY CRITERIA [J].
BURNS, RN .
NAVAL RESEARCH LOGISTICS, 1976, 23 (01) :125-129
[4]   MINIMIZING WAITING TIME VARIANCE IN SINGLE MACHINE PROBLEM [J].
EILON, S ;
CHOWDHURY, IG .
MANAGEMENT SCIENCE, 1977, 23 (06) :567-575
[5]   ONE MACHINE SEQUENCING TO MINIMIZE MEAN FLOW TIME WITH MINIMUM NUMBER TARDY [J].
EMMONS, H .
NAVAL RESEARCH LOGISTICS, 1975, 22 (03) :585-592
[6]  
French S., 1982, SEQUENCING SCHEDULIN
[7]  
French S., 1983, MULTIOBJECTIVE DECIS
[8]   PROPER EFFICIENCY AND THEORY OF VECTOR MAXIMIZATION [J].
GEOFFRION, AM .
JOURNAL OF MATHEMATICAL ANALYSIS AND APPLICATIONS, 1968, 22 (03) :618-+
[9]   EXTENSION OF A RESULT ON SCHEDULING WITH SECONDARY CRITERIA [J].
HECK, H ;
ROBERTS, S .
NAVAL RESEARCH LOGISTICS, 1972, 19 (02) :403-405
[10]   MINIMIZING VARIATION OF FLOW TIME IN SINGLE-MACHINE SYSTEMS [J].
KANET, JJ .
MANAGEMENT SCIENCE, 1981, 27 (12) :1453-1459