共 50 条
- [41] EXPERIENCE IN OPERATION AND MAINTENANCE OF MATERIALS HANDLING PLANT AT BRITISH STEEL CORPORATION'S RAVENSCRAIG AND HUNTERSTON WORKS. Steel Times, 1983, 211 (01): : 10 - 12
- [44] AUTOMATIC INSPECTION DEVICE FOR SURFACE FLAW IN ETL LINE IN NAGOYA WORKS OF NIPPON-STEEL-CORPORATION TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (13): : 1338 - 1338
- [46] HEAVY PLATE MILL OVERALL MANAGEMENT AND CONTROL SYSTEM AT NIPPON STEEL CORPORATION, OITA WORKS. Toshiba Review (International Edition), 1979, (120): : 20 - 26
- [47] RECENT OPERATION OF NO-4 CCM IN OITA WORKS, NIPPON-STEEL-CORP TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S264 - S264
- [48] 127 DAYS NON SHUTDOWN OPERATION OF TOBATA NO 4-BF OF NIPPON-STEEL-CORPORATION TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S11 - S11
- [49] ACTION GUIDE SYSTEM OF SAKAI NO 2 BLAST-FURNACE OPERATION OF NIPPON-STEEL-CORPORATION TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S12 - S12
- [50] The new compact steelmaking plant at SUEZ STEEL, Egypt REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 2001, 98 (04): : 335 - +