Solving Re-entrant No-wait Flowshop Scheduling Problem

被引:5
作者
Hassanpour, S. Tasouji [1 ]
Amin-Naseri, M. R. [1 ]
Nahavandi, N. [1 ]
机构
[1] Tarbiat Modares Univ, Dept Ind Engn, Tehran, Iran
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2015年 / 28卷 / 06期
关键词
Re-entrant Flowshop; No-wait Flowshop; Genetic Algorithm; Simulated Annealing; Bottleneck;
D O I
10.5829/idostije.2015.28.06c.11
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, we consider the production environment of no-wait reentrant flow shop with the objective of minimizing makespan of the jobs. In a reentrant flow shop, at least one job should visit at least one of the machines more than once. In a no-wait flowshop scheduling problem, when the process of a specific job begins on the first machine, it should constantly be processed without waiting in the line of any machine until its processing is completed on the last one. Integration of the properties of both of these environments, which is applied in many industries such as robotic industries, is not investigated separately. First, we develop a mathematical model for the problem and then we present three methods to solve it. Therefore, we construct simulated annealing (SA), genetic algorithm (GA) and a bottleneck based heuristic (BB) algorithms to solve the problem. Finally, the efficiency of the proposed methods is numerically analyzed.
引用
收藏
页码:903 / 912
页数:10
相关论文
共 17 条
[1]   New heuristics for no-wait flowshops to minimize makespan [J].
Aldowaisan, T ;
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (08) :1219-1231
[2]  
[Anonymous], 2012, FLOW SHOP SCHEDULING
[3]  
Attar S., 2011, INT J COMPUTER APPL, V28, P27
[4]   A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines [J].
Chen, Chun-Lung ;
Chen, Chuen-Lung .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (11) :3073-3081
[5]   A branch and bound procedure for the reentrant permutation flow-shop scheduling problem [J].
Chen, Jen-Shiang .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (11-12) :1186-1193
[6]   New multi-objective method to solve reentrant hybrid flow shop scheduling problem [J].
Dugardin, Frederic ;
Yalaoui, Farouk ;
Amodeo, Lionel .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 203 (01) :22-31
[7]  
Graham R. L., 1979, Discrete Optimisation, P287
[8]   Two-stage no-wait scheduling models with setup and removal times separated [J].
Gupta, JND ;
Strusevich, VA ;
Zwaneveld, CM .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (11) :1025-1031
[9]   A survey of machine scheduling problems with blocking and no-wait in process [J].
Hall, NG ;
Sriskandarajah, C .
OPERATIONS RESEARCH, 1996, 44 (03) :510-525
[10]   Efficient simulation-based composition of scheduling policies by integrating ordinal optimization with design of experiment [J].
Hsieh, Bo-Wei ;
Chen, Chun-Hung ;
Chang, Shi-Chung .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2007, 4 (04) :553-568