In the framework of a larger study, Lurgi investigated the feasibility of supplying an oil refinery with energy from a Module High Temperature Reactor. Preliminary results show: Supplying a refinery with energy from a Module-HTR is possible through conventional technical means. In addition, it is competitive if the average oil price of the last five years is considered and two Module-HTRs are employed. However, this statement does not apply with the oil price of 1986-1987.