A PRODUCTION AND MAINTENANCE PLANNING-MODEL WITH RESTORATION COST DEPENDENT ON DETECTION DELAY

被引:108
作者
LEE, HL
ROSENBLATT, MJ
机构
[1] TECHNION ISRAEL INST TECHNOL,FAC IND ENGN & MANAGEMENT,IL-32000 HAIFA,ISRAEL
[2] WASHINGTON UNIV,JOHN M OLIN SCH BUSINESS,ST LOUIS,MO 63130
关键词
D O I
10.1080/07408178908966243
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:368 / 375
页数:8
相关论文
共 22 条
[1]   OPTIMUM CHECKING PROCEDURES [J].
BARLOW, RE ;
HUNTER, LC ;
PROSCHAN, F .
JOURNAL OF THE SOCIETY FOR INDUSTRIAL AND APPLIED MATHEMATICS, 1963, 11 (04) :1078-1095
[2]  
BARLOW RE, 1965, MATH THEORY RELIABIL
[3]  
Chiu W. K., 1974, Journal of Quality Technology, V6, P63
[4]   ECONOMIC DESIGN OF ATTRIBUTE CONTROL CHARTS [J].
CHIU, WK .
TECHNOMETRICS, 1975, 17 (01) :81-87
[5]   ECONOMIC DESIGN OF NP CHARTS FOR PROCESSES SUBJECT TO A MULTIPLICITY OF ASSIGNABLE CAUSES [J].
CHIU, WK .
MANAGEMENT SCIENCE, 1976, 23 (04) :404-411
[6]  
CHIU WK, 1975, INT J PROD RES, V13, P341
[9]  
Goel A.L., 1973, MANAGE SCI, V19, P1271, DOI [10.1287/mnsc.19.11.1271, DOI 10.1287/MNSC.19.11.1271]
[10]  
Johnson LA, 1974, OPERATIONS RES PRODU