共 50 条
- [42] Study on influence of excavation sequence on the stability of coal pillar under final highwall with auger mining PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 1664 - 1669
- [43] Height of water-conducting zone in longwall top-coal caving mining under thick alluvium and soft overburden Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (11): : 3308 - 3316
- [44] Influence mechanism of pillar-side backfilling on the overburden-coal pillar system's stability under upward mining MATERIALS TODAY COMMUNICATIONS, 2025, 44
- [47] Study on influence of excavation sequence on the stability of coal pillar under final high wall with auger mining Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2005, 27 (07): : 768 - 771
- [48] Research on Width Optimization of Bearing Coal Pillar Between Roadways Under the Influence of Mining on Both Sides APPLIED SCIENCES-BASEL, 2025, 15 (01):
- [49] Experiment on separated layer rock failure technology for stress reduction of entry under coal pillar in mining conditions FRONTIERS IN ECOLOGY AND EVOLUTION, 2023, 11