Application of project risk management and performance indices in the construction sector: a case study

被引:0
作者
Ciaramella, Andrea [1 ]
机构
[1] Politecn Milan, Dipartimento ABC, Milan, Italy
来源
TECHNE-JOURNAL OF TECHNOLOGY FOR ARCHITECTURE AND ENVIRONMENT | 2013年 / 6卷
关键词
Project management; Risk assessment; Risk management; General contracting;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the construction sector, proper risk management may contribute effectively to improving decision-making processes. Principals and operators (businesses and professionals) may derive benefits from reducing environmental variability and uncertainty, limiting costs due to errors and the improper use of resources and significantly improving the quality of information streams. The article illustrates the results of two studies, the first conducted in the United Arab Emirates and the second carried out in Italy, with a similar methodological approach and objectives: verifying the nature of the main risks in construction, identifying to which party (owner or contractor) responsibility for such risks is assigned in practice, representing the circumstances in which responsibility is to be considered shared and emphasising the risks with the greatest probability of occurrence. The classification of identified risks al-lows principals not so much to prevent occurrences that may have impacts on a project as to limit and contain the events (risk reduction), partly through constant monitoring and control of activities, which is the most important critical factor to success.
引用
收藏
页码:100 / 108
页数:9
相关论文
共 9 条
  • [1] Preferred risk allocation in target cost contracts in construction
    Chan, Joseph
    Chan, Daniel
    Lam, Patrick
    Chan, Albert
    [J]. FACILITIES, 2011, 29 (13-14) : 542 - +
  • [2] Chapman C., 2004, International Journal of Project Management, V22, P619, DOI 10.1016/j.ijproman.2004.05.001
  • [3] El-Sayegh Sameh Monir, 2008, International Journal of Project Management, V26, P431, DOI 10.1016/j.ijproman.2007.07.004
  • [4] RISK MANAGEMENT PERCEPTIONS AND TRENDS OF US CONSTRUCTION
    KANGARI, R
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 422 - 429
  • [5] Kartam N.A., 2001, INT J PROJ MANAG, VVol. 19, P325, DOI [10.1016/S0263-7863(00)00014-4, DOI 10.1016/S0263-7863(00)00014-4]
  • [6] Measuring project risk management process for construction contractors with statement indicators linked to numerical scores
    Kululanga, Grant
    Kuotcha, Witness
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2010, 17 (04) : 336 - +
  • [7] Lyons T., 2004, International Journal of Project Management, V22, P51, DOI 10.1016/S0263-7863(03)00005-X
  • [8] Factors affecting contractor's business failure: contractors' perspective
    Mahamid, Ibrahim
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (03) : 269 - +
  • [9] Pilcher R, 1992, PROJECT COST CONTROL