Heuristic-Based Algorithm for Production Planning Considering Allocation Rate Conformance to Prevent Unstable Production Chain

被引:2
作者
Kim, Taehun [1 ]
Ji, Bongjun [1 ]
Cho, Hyunbo [1 ]
机构
[1] Pohang Univ Sci & Technol, Dept Ind & Management Engn, Pohang, South Korea
来源
INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS | 2015年 / 14卷 / 04期
关键词
Tabu Search; Imbalanced Allocation; Unfair Allocation; Production Contract;
D O I
10.7232/iems.2015.14.4.413
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study solved the problem of unstable production chains by considering allocation rate conformance. We proposed two phased algorithm suitable for solving production planning that considers allocation rate conformance; the first phase was heuristic initial solution generation, and the second phase was tabu-search based solution improvement. By using three data sets which have different sizes of data and three different criteria, the results of proposed algorithm were compared with MIP results. The proposed algorithm showed the best production plan in terms of allocation rate conformance, and it was appropriate for other criteria; it solved the problem of unstable production chains by solving concentrated and unfair allocation.
引用
收藏
页码:413 / 419
页数:7
相关论文
共 14 条
[1]  
Cachon GP, 2003, HDBK OPER R, V11, P229, DOI 10.1016/s0927-0507(03)11006-7
[2]  
Chen Y. Y., 2010, ENG TECHNOLOGY, V41, P1135
[3]  
Ehrgott M., 2005, MULTICRITERIA OPTIMI
[4]   PRODUCTION PLANNING - A REVIEW [J].
GELDERS, LF ;
VANWASSENHOVE, LN .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1981, 7 (02) :101-110
[5]   TABU SEARCH - A TUTORIAL [J].
GLOVER, F .
INTERFACES, 1990, 20 (04) :74-94
[6]  
Hwang C, 1979, MULTIPLE OBJECTIVE D, DOI [10.1007/978-3-642-45511-7_3, DOI 10.1007/978-3-642-45511-7_3]
[7]   Analysis of Standards Towards Simulation-Based Integrated Production Planning [J].
Kibira, Deogratias ;
Choi, Sang-Su ;
Jung, Kiwook ;
Bardhan, Tridip .
ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE PRODUCTION MANAGEMENT TOWARDS SUSTAINABLE GROWTH (AMPS 2015), PT II, 2015, 460 :39-48
[8]   Decomposing Packaged Services Towards Configurable Smart Manufacturing Systems [J].
Kim, Taehun ;
Bang, Seunghwan ;
Jung, Kiwook ;
Cho, Hyunbo .
ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE PRODUCTION MANAGEMENT TOWARDS SUSTAINABLE GROWTH (AMPS 2015), PT II, 2015, 460 :74-81
[9]   A multi-site supply network planning problem considering variable time buckets - A TFT-LCD industry case [J].
Lin, James T. ;
Chen, Yin-Yann .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 33 (9-10) :1031-1044
[10]   Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain [J].
Moon, C ;
Kim, J ;
Hur, S .
COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 43 (1-2) :331-349