共 50 条
- [1] HARVESTING SCHEDULING OF SUGARCANE FOR OPTIMUM BIOMASS PRODUCTION. Transactions of the American Society of Agricultural Engineers, 1979, 22 (06): : 1299 - 1304
- [2] Stochastic scheduling for mechanical sugarcane harvesting ARTIFICIAL INTELLIGENCE IN AGRICULTURE 1998, 1998, : 31 - 35
- [4] Using an Artificial Neural Network and a Mathematical Model for Sugarcane Harvesting Scheduling 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 308 - 312
- [5] OPTIMUM PRODUCTION SCHEDULING OF MULTICOMMODITY IN FLOW LINE IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1972, SMC2 (04): : 486 - +
- [6] GENERALIZED LAGRANGE MULTIPLIER ALGORITHM FOR OPTIMUM OR NEAR OPTIMUM PRODUCTION SCHEDULING MANAGEMENT SCIENCE SERIES A-THEORY, 1972, 18 (05): : 299 - 311
- [8] ELECTRICITY PRODUCTION FROM THE BIOMASS OF THE SUGARCANE INDUSTRY IN MAURITIUS BIOMASS, 1984, 5 (04): : 283 - 297