The AMSE Lean Six Sigma governance model

被引:29
|
作者
Arcidiacono, Gabriele [1 ]
Costantino, Nico [2 ]
Yang, Kai [2 ,3 ]
机构
[1] Marconi Univ, Innovat & Informat Engn Dept, Rome, Italy
[2] Leanprove, Florence, Italy
[3] Wayne State Univ, Ind & Syst Engn Dept, Detroit, MI USA
关键词
AMSE Model; Continuous improvement sustainability; LSS Board; LSS deployment; Operational excellence framework;
D O I
10.1108/IJLSS-06-2015-0026
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The sustainability of the Lean Six Sigma (LSS) program represents the most challenging aspect for most of the organizations dealing with this methodology. In this scenario, the purpose of this paper is the description of the AMSE (which stands for Assessment, Monitoring, Sustainability, Expansion) Model, that represents a leading-edge approach to implement an effective LSS deployment on a permanent basis, by means of a structured roadmap. Design/methodology/approach - The AMSE roadmap is made of four operating phases Assessment, Monitoring, Sustainability, Expansion - it is a Model to govern the LSS deployment and to maximize both operative and economical results on a long-term basis. Findings - One of the main problems of LSS programs is their sustainability (sustainability of projects and the overall program) over time; the AMSE Model allows the deployment of an LSS Governance Structure with a clear definition of tasks; this model can be effectively applied both to small and medium enterprises (SMEs) and global companies, regardless of the sector. Practical implications - Both SMEs and global corporations could benefit from applying the AMSE in terms of operational efficiency, culture improvement and people engagement. Originality/value - The AMSE Model represents an innovative approach for sustaining a continuous improvement culture in the organizations over time, by defining four steps (Assessment, Monitoring, Sustainability, Expansion), divided into detailed tasks, each of which is characterized by its own specific tools.
引用
收藏
页码:233 / 266
页数:34
相关论文
共 50 条
  • [41] The Development of the Lean Six Sigma Readiness Assessment Model for the Hotel Sector
    Kembi, Thymoti D.
    Wahjudi, Didik
    Wijaya, Serli
    JOURNAL OF QUALITY ASSURANCE IN HOSPITALITY & TOURISM, 2024,
  • [42] Applying lean six sigma in a small engineering company - a model for change
    Thomas, Andrew
    Barton, Richard
    Chuke-Okafor, Chiamaka
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2008, 20 (01) : 113 - 129
  • [43] Barriers to lean six sigma implementation in the supply chain: An ISM model
    Ali, Syed Mithun
    Hossen, Md Anwar
    Mahtab, Zuhayer
    Kabir, Golam
    Paul, Sanjoy Kumar
    Adnan, Zia ul Haq
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149 (149)
  • [44] Observation: A Lean tool for improving the effectiveness of Lean Six Sigma
    Arumugam, V.
    Antony, Jiju
    Douglas, Alex
    TQM Journal, 2012, 24 (03): : 275 - 287
  • [45] Quality and Safety in Healthcare, Part XCIII Design for Six Sigma and Lean Six Sigma
    Harolds, Jay A.
    CLINICAL NUCLEAR MEDICINE, 2023, 48 (10) : 919 - 921
  • [46] Infrared technology: A tool for Lean Six Sigma
    Glass International, 2007, 30 (04): : 34 - 37
  • [47] A Lean Six Sigma program in higher education
    Svensson, Carsten
    Antony, Jiju
    Ba-Essa, Mohamed
    Bakhsh, Majed
    Albliwi, Saja
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2015, 32 (09) : 951 - +
  • [48] Lean Six Sigma in higher education institutions
    Sunder, Vijaya M.
    INTERNATIONAL JOURNAL OF QUALITY AND SERVICE SCIENCES, 2016, 8 (02) : 159 - 178
  • [49] Study on integration of Six Sigma and lean production
    Shi, Jinping
    Wang, Shuang
    Fifth Wuhan International Conference on E-Business, Vols 1-3: INTEGRATION AND INNOVATION THROUGH MEASUREMENT AND MANAGEMENT, 2006, : 2205 - 2209
  • [50] Reinventing lean six sigma for the pharmaceutical industry
    Shanley, Agnes
    Pharmaceutical Technology, 2017, 41 (10) : 76 - 80