A New Precast Concrete Deck System for Accelerated Bridge Construction

被引:5
作者
Morcous, George [1 ]
Hatami, Afshin [2 ]
Jaber, Fouad [3 ]
机构
[1] Univ Nebraska Lincoln, Durham Sch Architectural Engn & Construct, 1110 S 67th St, Omaha, NE 68182 USA
[2] Bentley Syst Inc, RM Bridge, 510 Shotgun Rd, Sunrise, FL 33326 USA
[3] Nebraska Dept Transportat, Bridge Div, 1500 Highway 2, Lincoln, NE 68509 USA
来源
ADVANCES IN CIVIL ENGINEERING MATERIALS | 2018年 / 7卷 / 03期
关键词
precast concrete; bridge deck; accelerated construction; interface shear; post-tensioning;
D O I
10.1520/ACEM20170108
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Full-depth precast concrete (PC) deck systems have several advantages over cast-in-place concrete decks in bridge construction, such as improved product quality, reduced construction labor and duration, and less dependence on weather and site conditions. This article presents he development of a new full-depth PC deck system that overcomes the drawbacks of existing systems, which include large numbers of joints and openings that need to be field cast, a requirement for tight tolerances in panel production and erection, a need for an overlay, and a complexity of post-tensioning and grouting operations. The developed deck system consists of full-depth, full-width PC deck panels that are 12 ft (3.66 m) long to minimize the number of transverse joints that need to be field cast. Panels have covered shear pockets at 4-ft (1.22 m) spacing over each girder line. These pockets are designed to minimize the number of shear connectors and deck surface penetrations to eliminate deck overlay. Deck panels are prestressed in both directions: pre-tensioned in the transverse direction and post-tensioned in the longitudinal direction using a new approach that is ductless and easy to install. These unique features are expected to enhance deck constructability, durability, and economy. The article presents the deck system design, construction sequence, and laboratory investigations conducted prior to its implementation in the construction of the Kearney East Bypass bridge in the state of Nebraska, USA.
引用
收藏
页码:303 / 327
页数:25
相关论文
共 13 条
[1]  
American Association of State Highway and Transportation Officials, 2014, AASHTO LRFD BRIDG DE, V7th
[2]  
Badie S. S., 2008, 1265 NCHRP
[3]   Design and Implementation of Self-Consolidating Concrete for Connecting Precast Concrete Deck Panels to Bridge Girders [J].
Cao, Qi ;
Hwang, Soo-Duck ;
Khayat, Kamal H. ;
Morcous, George .
JOURNAL OF MATERIALS IN CIVIL ENGINEERING, 2016, 28 (08)
[4]  
FHWA (Federal Highway Administration), 2017, PREF BRIDG EL SYST
[5]  
Hatami A., 2014, THESIS U NEBRASKA LI
[6]  
Morcous G., 2014 PCI ANN CONV NA
[7]  
Morcous G., 2013, M323 NEBR DEP ROADS
[8]  
Morcous G., 2017, 2017 PCI ANN CONV NA
[9]  
Morcous G., 2015, M336 NEBR DEP ROADS
[10]  
Morcous G., 2014, DTRT06G04 CTR TRANSP