Results are presented which are related to the optimal design of unpaced production lines. It has been shown proviously that unbalancing an unpaced production line in an appropriate way will increase its production rate. Results are presented which show how the optimal allocation of work between stations changes with respect to (1) the number of work stations in the line, (2) the limit on the amount of work-in-progress, and (3) the variance of station operation times. An analysis of results given here demonstrate the following system characteristics. When the number of stations in the production line increases, the average amount of unbalance in the optimal allocation remains about the same, but the increase in mean production rate obtained by using the optimal allocation rather than the balanced line becomes substantially larger. If the operation times are highly variable (exponential distribution), the effect of increasing in-process storage space is to substantially decrease the average amount of unbalance in the optimal allocation but to only slightly decrease the resulting improvement over the balanced line. If the amount of in-process storage space is very small, the effect of decreasing the variability of operation times is to decrease these same quantities but at a suprisingly slow rate.
引用
收藏
页码:721 / 728
页数:8
相关论文
共 21 条