SCHEDULING ON A HYPERCUBE

被引:2
作者
SHEN, XJ [1 ]
REINGOLD, EM [1 ]
机构
[1] UNIV ILLINOIS,DEPT COMP SCI,URBANA,IL 61801
关键词
HYPERCUBE; SCHEDULING; ANALYSIS OF ALGORITHMS; DESIGN OF ALGORITHMS; COMPUTER ARCHITECTURE;
D O I
10.1016/0020-0190(91)90201-R
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We present a THETA(n2) worst-case-time algorithm to determine the minimum finishing time for a preemptive schedule of n independent jobs on a hypercube of fixed dimension.
引用
收藏
页码:323 / 328
页数:6
相关论文
共 9 条
[1]   AN O(N LOG N) FEASIBILITY ALGORITHM FOR PREEMPTIVE SCHEDULING OF N INDEPENDENT JOBS ON A HYPERCUBE [J].
AHUJA, M ;
ZHU, YH .
INFORMATION PROCESSING LETTERS, 1990, 35 (01) :7-11
[2]   PREEMPTIVE SCHEDULING OF INDEPENDENT JOBS ON A HYPERCUBE [J].
CHEN, GI ;
LAI, TH .
INFORMATION PROCESSING LETTERS, 1988, 28 (04) :201-206
[3]   PREEMPTIVE SCHEDULING TO MINIMIZE MAXIMUM COMPLETION-TIME ON UNIFORM PROCESSORS WITH MEMORY CONSTRAINTS [J].
MARTEL, C .
OPERATIONS RESEARCH, 1985, 33 (06) :1360-1380
[4]  
Megiddo N., 1979, Mathematics of Operations Research, V4, P414, DOI 10.1287/moor.4.4.414
[5]   THE COSMIC CUBE [J].
SEITZ, CL .
COMMUNICATIONS OF THE ACM, 1985, 28 (01) :22-33
[6]  
Stein C, 2001, INTRO ALGORITHMS 2 V, Vsecond
[7]   NP-COMPLETE SCHEDULING PROBLEMS [J].
ULLMAN, JD .
JOURNAL OF COMPUTER AND SYSTEM SCIENCES, 1975, 10 (03) :384-393
[8]  
Zhu Y., 1990, Proceedings. The 10th International Conference on Distributed Computing Systems (Cat. No.90CH2878-7), P510, DOI 10.1109/ICDCS.1990.89321
[9]  
[No title captured]