Turbine housing for the hydroelectric power station on the Rio Negro

被引:0
作者
不详
机构
来源
ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE | 1938年 / 82卷
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:1058 / 1059
页数:2
相关论文
共 50 条
[31]   GENERATORS FOR ILHA SOLTEIRA HYDROELECTRIC POWER-STATION [J].
FIESENIG, K .
BROWN BOVERI REVIEW, 1975, 62 (7-8) :356-360
[32]   Hydroelectric power station "El Molinar" by Jucar. [J].
Meyer, K .
ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1912, 56 :1181-1185
[33]   'Rio Negro' [J].
Peris Peris, C .
CHASQUI-REVISTA DE LITERATURA LATINOAMERICANA, 2004, 33 (01) :192-194
[34]   MIMO generalized predictive control for a hydroelectric power station [J].
Munoz-Hernandez, German Ardul ;
Jones, Dewi .
IEEE TRANSACTIONS ON ENERGY CONVERSION, 2006, 21 (04) :921-929
[35]   The history of the electrification of Japan and the Keage Hydroelectric Power Station [J].
Yanabu, Satoru .
IEEJ Transactions on Fundamentals and Materials, 2009, 129 (06) :396-402
[36]   THE HYDROELECTRIC POWER-STATION AT GABCIKOVO (BOS)-NAGYMAROS [J].
LAKI, G .
ENERGIA ES ATOMTECHNIKA, 1988, 41 (02) :49-55
[37]   'Rio Negro' [J].
Maxwell, G .
POETRY WALES, 1997, 33 (01) :43-43
[38]   The Estimation of Hydroelectric Power Station Functioning Efficiency at the Poor Power Quality [J].
Viktorovna, Savina Natalia ;
Andreevich, Suhomesov Michail .
2009 10TH INTERNATIONAL CONFERENCE ON ELECTRICAL POWER QUALITY AND UTILISATION (EPQU 2009), 2009, :198-+
[39]   Waterhammer control in Kaplan turbine hydroelectric power plants [J].
Bergant, A ;
Sijamhodzic, E .
8TH INTERNATIONAL CONFERENCE ON PRESSURE SURGES: SAFE DESIGN AND OPERATION OF INDUSTRIAL PIPE SYSTEMS, 2000, (39) :55-65
[40]   Study of transient two-phase flow of the turbine start of the Coo-2 hydroelectric storage power station [J].
Motte, MA ;
Lejeune, AGH .
HYDROPOWER IN THE NEW MILLENNIUM, 2001, :123-129