RISK ANALYSIS APPROACH TO SELECTION OF CONTRACTOR EVALUATION METHOD

被引:34
作者
JASELSKIS, EJ
RUSSELL, JS
机构
[1] Civ. and Constr. Engrg. Dept., Town Engrg., Iowa State University, Ames, IA 50011, Building
[2] Dept. of Civ. and Envir. Engrg., Univ. of Wisconsin-Madison, Madison
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1992年 / 118卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9364(1992)118:4(814)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Every project owner is faced with the contract administration decision of what evaluation method to select to adequately establish and ensure the qualification of candidate construction contractors. The evaluation methods available include (1) owner-contractor prequalification, (2) surety bonding, or (3) owner-contractor prequalification along with surety bonding. This paper describes an investigation into these evaluation methods and their impact on project outcome: (1) failure or (2) nonfailure. Failure is defined in this study as a significant breach of the contractor's legal responsibilities to the owner (for example, bankruptcy or material breach of contract related to meeting desired project objectives such as cost, schedule, and quality). Data were collected using a questionnaire survey and personal interviews. With regard to the questionnaire survey, 85 different organizations responsed and provided a total of 120 projects; 47 involved a contractor failure. Twenty industry experts provided probabilities associated with the various project outcomes. Expected value theory is used to determine expected outcomes of relevant project performance parameters. Results demonstrate that better owner-contractor evaluation leads to enhanced project performance. © ASCE.
引用
收藏
页码:814 / 821
页数:8
相关论文
共 11 条
[1]  
Ashley D.B., Coordinated insurance for major construction projects, J. Constr. Engrg. and Mgmt, 106, 3, pp. 307-313, (1980)
[2]  
De Neufville R., Applied Systems Analysis Engineering Planning and Technology Planning, pp. 297-320, (1990)
[3]  
Mendenhall W., Reinmuth J.E., Statistics for Management and Economics, (1982)
[4]  
Russell J.S., Skibniewski M.J., Decision criteria in contractor prequalification, J. Mgmt. in Engrg, 4, 2, pp. 148-164, (1988)
[5]  
Russell J.S., Surety industry: Overview, J. Mgmt. In Engrg, 6, 3, pp. 323-341, (1990)
[6]  
Russell J.S., Surety bonding and owner-contractor prequalification: Comparison, J. Prof. Issues Engrg, 116, 4, pp. 360-374, (1990)
[7]  
Russell J.S., Contractor failure: Analysis, J. Perf. Constr. Fac, 5, 3, pp. 163-180, (1991)
[8]  
Russell J.S., Radtke M.W., Subcontractor failure: Case history, Proc. 35th Annual Conf,, (1991)
[9]  
Russell J.S., Construction contract bonds, J. Mgmt. In Engrg, 7, 3, pp. 299-313, (1991)
[10]  
Russell J.S., Jaselskis E.J., Quantitativestudyof contractor evaluation programs and their impact on project outcome, J. Constr. Engrg. and Mgmt, 118, 3, pp. 612-624, (1992)