ANALYSIS FOR MINIMIZING WEIGHTED MEAN FLOW-TIME IN FLOWSHOP SCHEDULING

被引:31
作者
MIYAZAKI, S [1 ]
NISHIYAMA, N [1 ]
机构
[1] UNIV OSAKA PREFECTURE,COLL ENGN,DEPT IND ENGN,SAKAI,OSAKA 591,JAPAN
关键词
D O I
10.15807/jorsj.23.118
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:118 / 132
页数:15
相关论文
共 15 条
[1]  
FURUKAWA M, 1977, J JAPAN SOC PRECISIO, V43, P156
[2]  
Gupta J. N. D., 1972, AIIE T, V4, P11, DOI DOI 10.1080/05695557208974823
[3]  
GUPTA JND, 1971, J OPER RES SOC JPN, V14, P35
[4]   APPLICATION OF BRANCH AND BOUND TECHNIQUE TO SOME FLOW-SHOP SCHEDULING PROBLEMS [J].
IGNALL, E ;
SCHRAGE, L .
OPERATIONS RESEARCH, 1965, 13 (03) :400-&
[5]  
Johnson S. M., 1954, NAV RES LOGIST Q, V1, P61, DOI DOI 10.1002/NAV.3800010110
[6]   ON SCHEDULING PROBLEMS WITH DEFERRAL COSTS [J].
LAWLER, EL .
MANAGEMENT SCIENCE, 1964, 11 (02) :280-288
[7]   ADJACENT PAIRWISE APPROACH TO MEAN FLOW-TIME SCHEDULING PROBLEM [J].
MIYAZAKI, S ;
NISHIYAMA, N ;
HASHIMOTO, F .
JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1978, 21 (02) :287-301
[8]  
MIYAZAKI S, 1977, J JAPAN IND MANAGEME, V28, P84
[9]  
NABESHIMA I, 1973, J OPER RES SOC JPN, V16, P163
[10]  
NABESHIMA I, 1974, SCHEDULING THEORY