共 7 条
- [1] ALTERATION OF ROLL PASSES FOR CHANNELS ON 500 MILL OF KUZNETSK METALLURGICAL COMBINE STAL IN ENGLISH-USSR, 1966, (07): : 552 - &
- [2] OPTIMIZATION OF ROLLING RATE SCHEDULES IN FINISHING GROUP OF A CONTINUOUS WIDE-STRIP MILL STEEL IN THE USSR, 1973, 3 (08): : 660 - 662
- [5] IMPROVEMENT OF SCHEDULES FOR TEMPER ROLLING OF THIN SHEET-METAL ON 2-STAND 1400-MILL STEEL IN THE USSR, 1986, 16 (08): : 388 - 391
- [6] OPTIMIZATION OF REDUCTION SCHEDULES WITH AIM OF RAISING TEMPERATURE OF THIN SHEET AT END OF ROLLING STEEL IN THE USSR, 1974, 4 (05): : 391 - 393
- [7] REDISTRIBUTION OF REDUCTION IN STANDS OF FINISHING GROUP OF A 2500 MILL WITH AIM OF INCREASING YIELD OF GOOD SHEET STAL IN ENGLISH-USSR, 1967, (09): : 779 - &