SCHEDULING OF START-UP AND SHUT-DOWN OF THERMAL GENERATING UNITS CONSIDERING RELIABILITY

被引:2
作者
YAMASHIRO, S [1 ]
机构
[1] KITAMI INST TECHNOL,KYUSHU,JAPAN
关键词
D O I
10.1002/eej.4390940314
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
引用
收藏
页码:87 / 94
页数:8
相关论文
共 50 条
[21]   START-UP AND SHUT-DOWN SIMULATION OF A THERMAL BARRIER COATED GAS TURBINE BUCKET USING CFD CODE [J].
Hernandez Rossette, Alejandro ;
Zdzislaw, Mazur C. ;
Munoz, Rodolfo ;
Bautista, Eder .
PROCEEDINGS OF THE ASME POWER CONFERENCE 2008, 2008, :75-83
[22]   Start-up and Shut-down Conditions for Iterative Real-Time Optimization Methods [J].
Mukkula, Anwesh Reddy Gottu ;
Ahmad, Afaq ;
Engell, Sebastian .
2019 SIXTH INDIAN CONTROL CONFERENCE (ICC), 2019, :158-163
[23]   Tight and Compact MILP Formulation of Start-Up and Shut-Down Ramping in Unit Commitment [J].
Morales-Espana, German ;
Latorre, Jesus M. ;
Ramos, Andres .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (02) :1288-1296
[24]   OPTIMIZATION OF START-UP AND SHUT-DOWN OPERATION OF CONVERTERS IN SULFURIC-ACID PLANTS [J].
GAPINSKA, T ;
HLYN, T .
PRZEMYSL CHEMICZNY, 1991, 70 (10) :427-430
[25]   AUTOMATIC SYSTEM FOR PRODUCTION, START-UP AND SHUT-DOWN OF A MAINS FREQUENCY PLASMA TORCH [J].
MURGATROYD, JL .
MEASUREMENT AND CONTROL, 1974, 7 (03) :77-80
[26]   A tight MIP formulation of the unit commitment problem with start-up and shut-down constraints [J].
Gentile, C. ;
Morales-España, G. ;
Ramos, A. .
EURO Journal on Computational Optimization, 2017, 5 (1-2) :177-201
[27]   RESULTS OF AN INVESTIGATION INTO OPERATION OF LARGE UNITS AT VARIABLE PRESSURE AND DURING START-UP AND SHUT-DOWN - INFLUENCE OF THESE PROCESSES ON PLANT CONDITION [J].
PROKOPENKO, AG .
ENERGIETECHNIK, 1977, 27 (09) :337-344
[28]   Mixed thermal elastohydrodynamic lubrication analysis with dynamic performance of aero ball bearing during start-up and shut-down [J].
Shi, Xiujiang ;
Wu, Jiqiang ;
Zhao, Bin ;
Ma, Xuan ;
Lu, Xiqun .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART J-JOURNAL OF ENGINEERING TRIBOLOGY, 2020, 234 (06) :873-886
[29]   An MILP model for the thermal unit commitment problem with feasible energy delivery and start-up & shut-down power trajectories [J].
Deng, Jun ;
Wei, Hua ;
Li, Jinghua .
Dianwang Jishu/Power System Technology, 2015, 39 (10) :2882-2888
[30]   Some effects of start-up and shut-down on thrust bearing assemblies in hydro-generators [J].
Ettles, CM ;
Seyler, J ;
Bottenschein, M .
JOURNAL OF TRIBOLOGY-TRANSACTIONS OF THE ASME, 2003, 125 (04) :824-832