HEURISTIC ALGORITHMS FOR SCHEDULING INDEPENDENT TASKS ON NONIDENTICAL PROCESSORS

被引:367
作者
IBARRA, OH [1 ]
KIM, CE [1 ]
机构
[1] UNIV MINNESOTA, DEPT COMP SCI, MINNEAPOLIS, MN 55455 USA
关键词
D O I
10.1145/322003.322011
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
引用
收藏
页码:280 / 289
页数:10
相关论文
共 9 条
[1]   SCHEDULING INDEPENDENT TASKS TO REDUCE MEAN FINISHING TIME [J].
BRUNO, J ;
COFFMAN, EG ;
SETHI, R .
COMMUNICATIONS OF THE ACM, 1974, 17 (07) :382-387
[2]  
BRUNO J, INFORMATION PROCESSI, P504
[3]  
COFFMAN EG, 1976, MAR P INT S COMPTR P, P306
[4]  
Conway R, 1967, THEORY SCHEDULING
[5]  
GONZALEZ T, 1974, 751 U MINN COMPTR SC
[6]   BOUNDS ON MULTIPROCESSING TIMING ANOMALIES [J].
GRAHAM, RL .
SIAM JOURNAL ON APPLIED MATHEMATICS, 1969, 17 (02) :416-&
[7]   EXACT AND APPROXIMATE ALGORITHMS FOR SCHEDULING NONIDENTICAL PROCESSORS [J].
HOROWITZ, E ;
SAHNI, S .
JOURNAL OF THE ACM, 1976, 23 (02) :317-327
[8]  
Karp Richard M., 1972, COMPLEXITY COMPUTER, P85
[9]  
Sahni S., 1974, SIAM Journal on Computing, V3, P262, DOI 10.1137/0203021