ON INTERVAL-BASED TEMPORAL PLANNING - AN IQ-STRATEGY

被引:0
作者
RICHARDS, B
JIANG, Y
CHOI, H
机构
来源
LECTURE NOTES IN ARTIFICIAL INTELLIGENCE | 1991年 / 542卷
关键词
INTERVALS; POINTS; PLANNING; ACTIONS; FRAME PROBLEM; QUALIFICATION PROBLEM; MAXIMAL INTERVAL PRINCIPLE; TEMPORAL LOGICS; CONSTRAINT SATISFACTION; COLLAPSING AND STRETCHING CLIPPING;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Allen & Koomen's interval planner and Dean & McDermott's time map manager (TMM) offer different approaches to temporal database management in planning. In this paper we present a temporal planning system that integrates ideas from both methods, and at the same time develops several new ideas. In particular, we treat time points and intervals within a common structure, and adopt an alternative method for handling temporal constraints based on constraint logic programming. To provide a proper characterization of actions within an interval environment, we invoke the notion of noninterference conditions to handle action interaction and the qualification problem. To deal with the persistence problem, we adopt a spectrum of methods based on TMM's stretching and clipping rules. We show that our approach allows a temporally minimum specification for preconditions, which not only improves the clarity of the specification of an action, but perhaps also reduces the computational cost of constraint satisfaction. The formal aspects of our temporal approach are encapsulated in an interval temporal logic called IQ which is functionally more expressive than first order logic. The specification of our temporal reasoning is modelled in IQ-Prolog - a computation-oriented subsidiary language of IQ.
引用
收藏
页码:226 / 235
页数:10
相关论文
共 50 条
  • [21] An interval-based regret-analysis method for identifying long-term municipal solid waste management policy under uncertainty
    Cui, L.
    Chen, L. R.
    Li, Y. P.
    Huang, G. H.
    Li, W.
    Xie, Y. L.
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2011, 92 (06) : 1484 - 1494
  • [22] A robust interval-based minimax-regret analysis approach for the identification of optimal water-resources-allocation strategies under uncertainty
    Li, Y. P.
    Huang, G. H.
    Nie, S. L.
    RESOURCES CONSERVATION AND RECYCLING, 2009, 54 (02) : 86 - 96
  • [23] Timeline-based planning over dense temporal domains
    Bozzelli, Laura
    Molinari, Alberto
    Montanari, Angelo
    Peron, Adriano
    Woeginger, Gerhard
    THEORETICAL COMPUTER SCIENCE, 2020, 813 : 305 - 326
  • [24] Research on mission planning of multiple AUVs based on hybrid strategy
    Yan, Shaokun
    Xu, Jihua
    Zhang, Ping
    Song, Linan
    2021 4TH INTERNATIONAL CONFERENCE ON INTELLIGENT AUTONOMOUS SYSTEMS (ICOIAS 2021), 2021, : 366 - 370
  • [25] Perception-Based Temporal Logic Planning in Uncertain Semantic Maps
    Kantaros, Yiannis
    Kalluraya, Samarth
    Jin, Qi
    Pappas, George J.
    IEEE TRANSACTIONS ON ROBOTICS, 2022, 38 (04) : 2536 - 2556
  • [26] Optimal Planning of High Renewable Generations: A Temporal Scenario Based Approach
    Li, Ting
    Zhu, Mi
    Yang, Xinting
    Li, Ao
    Wei, Xiangyu
    2019 IEEE ASIA POWER AND ENERGY ENGINEERING CONFERENCE (APEEC 2019), 2019, : 307 - 312
  • [27] A Knowledge-Based Temporal Planning Approach for Urban Traffic Control
    Lu, Xu
    Zhang, Nan
    Tian, Cong
    Yu, Bin
    Duan, Zhenhua
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2021, 22 (03) : 1907 - 1918
  • [28] Planning hydroelectric resources with recourse-based multistage interval-stochastic programming
    B. Luo
    D. C. Zhou
    Stochastic Environmental Research and Risk Assessment, 2009, 23 : 65 - 73
  • [29] Planning hydroelectric resources with recourse-based multistage interval-stochastic programming
    Luo, B.
    Zhou, D. C.
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2009, 23 (01) : 65 - 73
  • [30] A Strategy to Support Software Planning Based on Piece of Work and Agile Paradigm
    Sande, Deysiane
    Sanchez, Arnaldo
    Montebelo, Renan
    Fabbri, Sandra
    Hernandes, Elis Montoro
    ENTERPRISE INFORMATION SYSTEMS, 2011, 73 : 104 - 118