共 19 条
- [1] Anthony RobertNewton, 1965, PLANNING CONTROL SYS
- [2] Baker KennethR., 1977, DECISION SCI, V8, P19, DOI [DOI 10.1111/J.1540-5915.1977.TB01065.X, 10.1111/j.1540-5915.1977.tb01065.x]
- [3] ANALYTIC FRAMEWORK FOR EVALUATING ROLLING SCHEDULES [J]. MANAGEMENT SCIENCE, 1979, 25 (04) : 341 - 351
- [4] Berry W.L., 1982, J OPERATIONS MANAGEM, V3, P13
- [5] Blackburn J. D., 1980, Decision Sciences, V11, P691, DOI 10.1111/j.1540-5915.1980.tb01170.x
- [6] Blackburn JD., 1982, J OPER MANAG, V2, P125, DOI [10.1016/0272-6963(82)90028-6, DOI 10.1016/0272-6963(82)90028-6]
- [7] Carlson R. C., 1982, Decision Sciences, V13, P129, DOI 10.1111/j.1540-5915.1982.tb00136.x
- [8] Chand S., 1982, Decision Sciences, V13, P113, DOI 10.1111/j.1540-5915.1982.tb00134.x
- [9] REPLANNING FREQUENCIES FOR MASTER PRODUCTION SCHEDULES [J]. DECISION SCIENCES, 1986, 17 (02) : 263 - 273
- [10] CHUNG CH, 1984, J OPERATIONS MANAGEM, V4, P389