Implementing BIM on Infrastructure: Comparison of Two Bridge Construction Projects

被引:64
作者
Fanning, Blaine [1 ]
Clevenger, Caroline M. [1 ,2 ]
Ozbek, Mehmet E. [1 ]
Mahmoud, Hussam [3 ]
机构
[1] Colorado State Univ, Dept Construct Management, Ft Collins, CO 80523 USA
[2] Univ Colorado Denver, Dept Civil Engn, Denver, CO 80217 USA
[3] Colorado State Univ, Dept Civil Engn, Ft Collins, CO 80523 USA
关键词
Architectural design - Bridges - Life cycle - Cost reduction;
D O I
10.1061/(ASCE)SC.1943-5576.0000239
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This research provides comparative analysis of the impacts and benefits associated with using building information modeling (BIM) on accelerated bridge construction in the Denver metropolitan area. To date, BIM remains a relatively underutilized tool in horizontal construction. BIM has the potential, however, to significantly increase efficiencies, minimize waste, and increase sustainability across infrastructure projects throughout their life cycles. This research studies the impacts of the first implementation of BIM processes on one of two structurally similar concurrent bridge construction projects by comparing metrics related to substructure costs, requests for information, change orders, rework, and schedule. Findings suggest that negative cost impacts of approximately 70% may be associated with the first implementation of BIM during construction. However, additional findings suggest that the use of BIM may facilitate otherwise infeasible complex projects and reduce requests for information and change orders and has the potential to realize cost savings during follow-on projects. Specifically, findings from this case study suggest that BIM may have provided approximately 5-9% cost savings during construction by contributing to reduced change orders and rework. Revealing such impacts and benefits associated with using BIM on transportation infrastructure construction begins to inform the industry and, in particular, organizations such as DOTs and urban transportation districts about potential opportunities related to BIM implementation. Additional and potentially significantly greater benefits may be realized through future BIM-enabled operation and maintenance of such infrastructure. This study provides a valuable first step in motivating the implementation of BIM within and throughout infrastructure asset management and motivates future research related to the use of BIM during infrastructure construction and operation. (C) 2014 American Society of Civil Engineers.
引用
收藏
页数:8
相关论文
共 15 条
[1]  
Aashto, 2002, STAND SPEC HIGHW BRI
[2]  
Autodesk, 2012, BIM INFR VEH BUS TRA
[3]   Building information modeling for sustainable design and LEED® rating analysis [J].
Azhar, Salman ;
Carlton, Wade A. ;
Olsen, Darren ;
Ahmad, Irtishad .
AUTOMATION IN CONSTRUCTION, 2011, 20 (02) :217-224
[4]   How to measure the benefits of BIM - A case study approach [J].
Barlish, Kristen ;
Sullivan, Kenneth .
AUTOMATION IN CONSTRUCTION, 2012, 24 :149-159
[5]  
Bennett T., 2012, BIM RISE INFRASTRUCT
[6]  
Colorado DOT (CDOT), 2013, POSTBR MOB TECHN WOR
[7]  
Colorado DOT (CDOT), 2012, BRIDG DES MAN
[8]  
Culmo MP, 2011, ACCELERATED BRIDGE C
[9]  
International Alliance for Interoperability (IAI), 1997, GUID DEV IND FDN CLA
[10]  
Jones S.A., 2012, BUSINESS VALUE BIM I