共 22 条
[1]
Baker K.R., Introduction to Sequencing and Scheduling, pp. 136-137, (1974)
[2]
Bernad J., La distribution log-normale dans les problemes industriels, Production Et Gestion, 252, pp. 21-27, (1973)
[3]
Campbell H.G., Dudek R.A., Smith N.L., A heuristic algorithm for the n job, m machine sequencing problem, Management Science, 16, (1970)
[4]
Corwin B.D., Esogbue A.O., Two-machine ftowshop scheduling problems with sequence dependent setup times: A dynamic programming approach, Naval Research Logistics Quarterly, 21, pp. 515-524, (1974)
[5]
Dannenbring D.G., An evaluation of ftowshop sequencing heuristic, Management Science, 23, pp. 1174-1182, (1977)
[6]
Garey M.R., Johnson D.S., Computers and Intractability: A Guided Tour to the Theory of N P-Completeness, (1979)
[7]
Gupta J., A general algorithm for the n x M scheduling problem, International Journal of Production Research, 7, (1969)
[8]
Gupta J., A search algorithm for generalized flow shop scheduling problem, Computers and Operations Research, 2, pp. 83-90, (1975)
[9]
Gupta J., A Review of Flow Shop Scheduling Research. Disaggregation: Problems in Manufacturing and Service Organizations, pp. 363-388, (1979)
[10]
Gupta J., Flowshop schedules with sequence dependent setup times, Journal of the Operations Research Society of Japan, 29, pp. 206-219, (1986)