共 25 条
[1]
Ahuja H. N., 1994, PROJECT MANAGEMENT T
[2]
Al Bawaba, 2005, UAE CONSTR CLAIMS 10
[3]
Al-Khalil M., 1999, J CONSTRUCTION MANAG, V17, P647, DOI DOI 10.1080/014461999371259
[4]
Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51, DOI DOI 10.1016/S0263-7863(98)00060-X
[5]
Arditi D., 1989, International Journal of Project Management, V7, P141, DOI 10.1016/0263-7863(89)90032-X
[6]
Bramble B.B., 1992, CONSTRUCTION DELAYS, V2nd
[7]
Bramble B.B., 1990, AVOIDING RESOLVING C, V1st
[8]
Bubshait K., 1998, INT J PROJECTS MANAG, V8, P222
[9]
Easton G.R., 1989, TECHNICAL REPORT