Payback period of investments in energy saving

被引:37
作者
Gorshkov, A. S. [1 ]
Vatin, N. I. [1 ]
Rymkevich, P. P. [2 ]
Kydrevich, O. O. [3 ]
机构
[1] Peter Great St Petersburg Polytech Univ, St Petersburg, Russia
[2] Mil Space Acad, St Petersburg, Russia
[3] RUE STROYTEHNORM, Minsk, BELARUS
来源
MAGAZINE OF CIVIL ENGINEERING | 2018年 / 78卷 / 02期
关键词
civil engineering; buildings; energy resources; energy consumption; operating costs; investments; return of investments; payback period; energy efficiency; energy saving;
D O I
10.18720/MCE.78.5
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Authors developed a mathematical model for estimating the discounted payback period of investments for reducing energy resources needed in building's development. Obtained equations allow calculating the projected payback period for investments in energy saving, taking into account the size of the investment, the estimated or actual value of the achieved energy saving effect, the dynamics of energy carriers tariff growth, the discounting of future cash flows, and also a value and a period of loan repayment. The proposed mathematical model allows to perform quickly and efficiently a comparison of various energy-saving solutions based on economic viability and choose the most optimal from them.
引用
收藏
页码:65 / 75
页数:11
相关论文
共 37 条
[2]   A method for fully automatic operation of domestic heating [J].
Boait, P. J. ;
Rylatt, R. M. .
ENERGY AND BUILDINGS, 2010, 42 (01) :11-16
[3]   Alpha and Persistence in Real Estate Fund Performance [J].
Bond, Shaun A. ;
Mitchell, Paul .
JOURNAL OF REAL ESTATE FINANCE AND ECONOMICS, 2010, 41 (01) :53-79
[4]  
Breslau V, 2007, SUSTAINABILITY PERSP
[5]   Thermal comfort models: A review and numerical investigation [J].
Cheng, Yuanda ;
Niu, Jianlei ;
Gao, Naiping .
BUILDING AND ENVIRONMENT, 2012, 47 :13-22
[6]   On the refurbishment of the public building stock toward the nearly zero-energy target: two Italian case studies [J].
Corrado, Vincenzo ;
Murano, Giovanni ;
Paduos, Simona ;
Riva, Giovanni .
71ST CONFERENCE OF THE ITALIAN THERMAL MACHINES ENGINEERING ASSOCIATION (ATI 2016), 2016, 101 :105-112
[7]   Energy performance assessment and a retrofit strategies in public school buildings in Rome [J].
de Santoli, L. ;
Fraticelli, F. ;
Fornari, F. ;
Calice, C. .
ENERGY AND BUILDINGS, 2014, 68 :196-202
[8]  
Demeulemeester E. L, 2005, PROJECT SCHEDULING R
[9]   On the fallacy of averages in project risk management [J].
Elmaghraby, SE .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) :307-313
[10]  
ELMAGHRABY SE, 1990, ARAB J SCI ENG, V15, P627