Backfilling technology and strata behaviors in fully mechanized coal mining working face

被引:78
作者
Qiang, Zhang [1 ,2 ]
Zhang Jixiong [1 ,2 ]
Huang Yanli [1 ,2 ]
Feng, Ju [1 ,2 ]
机构
[1] China Univ Min & Technol, Sch Mines, Xuzhou 221116, Peoples R China
[2] State Key Lab Coal Resources & Mine Safety, Xuzhou 221008, Peoples R China
基金
中国国家自然科学基金;
关键词
Fully mechanized backfilling and coal; mining technology; Hydraulic support; Formed backfilling scraper conveyor; Backfilling technology; Strata behaviors;
D O I
10.1016/j.ijmst.2011.08.003
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Based on the principle of fully mechanized backfilling and coal mining technology and combined with the Xingtai Coal Mine conditions, we mainly optimized the coal mining equipment and adjusted the coal mining method in the Xingtai Coal Mine 7606 working face for implementation this technology. Firstly, we define the practical backfilling process as the "(from backfilling scraper conveyor's) head to tail backfilling, step by step swinging up of the tamping arm, gradual compacting, moving formed backfilling scraper conveyor when the second tamping arm cannot pass and connecting the immediate roof by back material push front material movement". Meanwhile, the stress changes of backfill body in coal mined out area was monitored by stress sensors, and the roof caving law was analyzed by monitoring the dynamic subsidence of -210 west roadway of this face. The site tests results show that using this new backfilling and coal mining integrated technology, the production capacity in the 7606 working face can reach to 283,000 ton a year, and 282,000 ton of solid materials (waste and fly ash) is backfilled, which meets the needs of high production and efficiency. The goaf was compactly backfilled with solid material and the strata behavior was quite desirable, with an actual maximum vertical stress of the backfill body of 5.5 MPa. Backfill body control the movement of overburden within a certain range, and there is no collapses of major areas in the overlying strata upon backfilled gob. The maximum subsidence and speed were 231 mm and 15.75 mm/d respectively, which proved the practical significance of this integrated technology. (C) 2012 Published by Elsevier B.V. on behalf of China University of Mining & Technology.
引用
收藏
页码:151 / 157
页数:7
相关论文
共 21 条
[1]  
Chen J, 2010, J MIN SAF ENG, V27, P195
[2]  
Feng, 2009, RES SUPER HIGH WATER
[3]  
[冯光明 Feng Guangming], 2010, [中国矿业大学学报. 自然科学版, Journal of China University of Mining & Technology], V39, P813
[4]   煤矿膏体充填开采工艺的探讨 [J].
瞿群迪 ;
周华强 ;
侯朝炯 ;
关明亮 .
煤炭科学技术, 2004, (10) :67-69+73
[5]  
Huang Yanli, 2010, Proceedings 2010 International Conference on Digital Manufacturing and Automation (ICDMA 2010), P872, DOI 10.1109/ICDMA.2010.450
[6]   Waste filling technology under condition of complicated geological condition working face [J].
Ju Feng ;
Zhang Ji-xiong ;
Huang Yan-li ;
An Tai-long .
PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MINING SCIENCE & TECHNOLOGY (ICMST2009), 2009, 1 (01) :1220-1227
[7]  
Liu J.G., 2010, COAL SCI TECHNOL, V38, P18
[8]  
[刘建功 Liu Jiangong], 2010, [煤炭学报, Journal of China Coal Society], V35, P1413
[9]  
Miao X. X., 2008, J CHINA U MIN TECHNO, V18, P479, DOI [10.1016/S1006-1266(08)60279-5, DOI 10.1016/S1006-1266(08)60279-5, DOI 10.3969/J.ISSN.2095-2686.2008.04.001]
[10]  
[缪协兴 MIAO Xie-xing], 2010, [煤炭学报, Journal of China Coal Society], V35, P1