Sequencing jobs in an engineer-to-order engineering environment

被引:18
作者
Grabenstetter, Douglas H. [1 ]
Usher, John M. [1 ]
机构
[1] Mississippi State Univ, Dept Ind & Syst Engn, Mississippi State, MS 39762 USA
来源
PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL | 2015年 / 3卷 / 01期
关键词
engineer-to-order; sequencing; design;
D O I
10.1080/21693277.2015.1035461
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Engineer-to-order (ETO) firms produce complex - one of a kind - products and desire shorter lead times as a key component to cost competitiveness. In ETO firms, the engineering process is the largest controllable consumer of lead time. Given that lead time is a function of completion rate and scheduling policy, one critical process is to accurately sequence jobs in front of the engineering function. However, unlike other manufacturing models, such as make-to-stock or make-to-order models, the design for an ETO product is not realized until after the engineering process has been completed. Hence, the only information available does not include data normally required by most sequencing algorithms. Therefore, the problem becomes the determination of an accurate schedule within a complex transactional process for jobs which have not even been designed yet. This paper investigates this topic in the context of the engineering process within the ETO model. Based on research conducted in conjunction with multiple firms, common factors are identified which drive complexity, and a new framework and algorithm are presented for using these factors to sequence jobs. Using discrete event simulation, the performance of this new algorithm is found to be a significant improvement over current industry and published methods.
引用
收藏
页码:201 / 217
页数:17
相关论文
共 50 条
  • [31] Purchasing Strategies, Tactics, and Activities in Engineer-to-Order Manufacturing
    Shlopak, Mikhail
    Rod, Espen
    Junge, Gabriele Hofinger
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: PRODUCTION MANAGEMENT FOR THE FACTORY OF THE FUTURE, PT I, 2019, : 562 - 569
  • [32] The impact of design uncertainty in engineer-to-order project planning
    Vaagen, Hajnalka
    Kaut, Michal
    Wallace, Stein W.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 261 (03) : 1098 - 1109
  • [33] Analyzing the factors affecting engineering change implementation performance in the engineer-to-order production environment: case studies from a Norwegian shipbuilding group
    Iakymenko, Natalia
    Brett, Per Olaf
    Alfnes, Erlend
    Strandhagen, Jan Ola
    PRODUCTION PLANNING & CONTROL, 2022, 33 (9-10) : 957 - 973
  • [34] Applicability of the capability maturity model for engineer-to-order firms
    Veldman, Jasper
    Klingenberg, Warse
    INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2009, 48 (02) : 219 - 239
  • [35] Procurement and Contractual Choices for Engineer-to-Order Supply Chains
    Gosling J.
    Hewlett B.
    Naim M.
    IEEE Engineering Management Review, 2021, 49 (01): : 174 - 180
  • [36] Determinants for order-fulfilment strategies in engineer-to-order companies: Insights from the machinery industry
    Cannas, Violetta G.
    Gosling, Jonathan
    Pero, Margherita
    Rossi, Tommaso
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2020, 228
  • [37] A Method for Modelling Business-Critical Architecture Decisions in Engineer-to-Order Companies
    Sohrt, Mikkel
    Blinkenberg, Willads
    Mortensen, Niels Henrik
    Haug, Anders
    Hvam, Lars
    APPLIED SCIENCES-BASEL, 2025, 15 (04):
  • [38] A system level product configurator for engineer-to-order supply chains
    Kristianto, Yohanes
    Helo, Petri
    Jiao, Roger Jianxin
    COMPUTERS IN INDUSTRY, 2015, 72 : 82 - 91
  • [39] Analyzing the factors affecting coordination in engineer-to-order supply chain
    Mello, Mario Henrique
    Strandhagen, Jan Ola
    Alfnes, Erlend
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2015, 35 (07) : 1005 - 1031
  • [40] A Concept for Project Manufacturing Planning and Control for Engineer-to-Order Companies
    Sriram, Pavan Kumar
    Alfnes, Erlend
    Arica, Emrah
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: COMPETITIVE MANUFACTURING FOR INNOVATIVE PRODUCTS AND SERVICES, AMPS 2012, PT II, 2013, 398 : 699 - 706