共 18 条
[1]
Raja, Sheth, Integration of Inspection into Automated Manufacturing System, Recent Developments in Production Research, (1988)
[2]
Groover, Automation Production Systems and Computer Integrated Manufacturing, (1987)
[3]
Golomski, Justification Methods for Computer Integrated Manufacturing Systems, Accounting Aspects of Automated Inspection Systems, (1990)
[4]
Elshennawy, The role of inspection in automated manufacturing, Comput. Ind. Eng., 17, 1-4, pp. 327-333, (1989)
[5]
Brans, Vincke, A preference ranking organization method the PROMETHEE method for MCDM, Management Science, 31, pp. 647-656, (1985)
[6]
Brans, Vincke, Mareschal, How to select and how to rank project: The PROMETHEE method, European J. Oper. Res., 24, pp. 228-238, (1986)
[7]
Brans, Mareschal, PROMETHEE V: MCDM problems with segmentation constraints, INFOR, 30, 2, pp. 85-96, (1992)
[8]
Brans, Operations Research '84, (1984)
[9]
Njen, A multiple criteria aproach to appropriate manufacturing industries selection: A case study of Taiwan, Master's Thesis, (1991)
[10]
Roy, How outranking relation helps multiple criteria decision making, Multiple Criteria Decision Making, (1973)