DESIGN AND SCHEDULING FOR FLEXIBLE MANUFACTURING CELLS WITH AUTOMATIC SET-UP EQUIPMENT

被引:7
作者
HITOMI, K
YOSHIMURA, M
OHASHI, K
机构
关键词
D O I
10.1080/00207548908942612
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:1137 / 1147
页数:11
相关论文
共 50 条
[31]   FLOWSHOP SCHEDULING OF ROBOTIC CELLS WITH JOB-DEPENDENT TRANSPORTATION AND SET-UP EFFECTS [J].
LEVNER, E ;
KOGAN, K ;
MAIMON, O .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (12) :1447-1455
[32]   Heuristics for scheduling sequence-dependent set-up jobs in flow line cells [J].
Reddy, V ;
Narendran, TT .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (01) :193-206
[33]   THE PREFERENTIAL LOOKING TECHNIQUE - EQUIPMENT AND PROCEDURE OF A CLINICAL SET-UP [J].
VITALDURAND, F ;
COTTARD, M .
JOURNAL FRANCAIS D OPHTALMOLOGIE, 1985, 8 (03) :267-272
[34]   Incorporating set-up effects into pile design [J].
Liu, Junwei ;
Yu, Feng ;
Qi, Kun .
ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 :418-+
[35]   EVALUATION OF SCHEDULING ALGORITHMS FOR RESOURCES WITH HIGH SET-UP TIME [J].
BOVET, DP ;
PETRINI, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1980, 5 (03) :182-192
[36]   Set-up reduction in pharmaceutical manufacturing: An action research study [J].
Gilmore, M ;
Smith, DJ .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1996, 16 (03) :4-+
[37]   FLOWSHOP SCHEDULING WITH SET-UP, PROCESSING AND REMOVAL TIMES SEPARATED [J].
PROUST, C ;
GUPTA, JND ;
DESCHAMPS, V .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (03) :479-493
[38]   Scheduling parameters in flexible manufacturing cells [J].
Slomp, J ;
Gaalman, G .
FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, 1998, 1998, :737-746
[39]   The scheduling function in flexible manufacturing cells [J].
Blaga, Florin Sandu .
ANNALS OF DAAAM FOR 2007 & PROCEEDINGS OF THE 18TH INTERNATIONAL DAAAM SYMPOSIUM: INTELLIGENT MANUFACTURING & AUTOMATION: FOCUS ON CREATIVITY, RESPONSIBILITY, AND ETHICS OF ENGINEERS, 2007, :85-86
[40]   Control and scheduling in flexible manufacturing cells [J].
Ferrolho, Antonio ;
Crisostomo, Manuel .
2006 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY, VOLS 1-6, 2006, :1369-+