ON A PROBLEM OF PRODUCTION SCHEDULING

被引:18
作者
BISHOP, GT
机构
关键词
D O I
10.1287/opre.5.1.97
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:97 / 103
页数:7
相关论文
共 7 条
[1]   PRODUCTION SCHEDULING BY THE TRANSPORTATION METHOD OF LINEAR-PROGRAMMING [J].
BOWMAN, EH .
OPERATIONS RESEARCH, 1956, 4 (01) :100-103
[2]   THE STEPPING STONE METHOD OF EXPLAINING LINEAR PROGRAMMING CALCULATIONS IN TRANSPORTATION PROBLEMS [J].
Charnes, A. ;
Cooper, W. W. .
MANAGEMENT SCIENCE, 1954, 1 (01) :49-69
[3]  
Dantzig GB, 1951, ACTIVITY ANALYSIS PR, V13
[4]  
Hitchcock F.L., 1941, J MATH PHYS, V20, P224, DOI DOI 10.1002/SAPM1941201224
[5]  
Jacobs W., 1954, NAVAL RES LOGIST Q, V1, P154
[6]  
PRAGER W, 1956, MANAGEMENT SCI, V13, P15
[7]  
VAJDA S, 1956, THEORY GAMES LINEAR