Performance comparison of bluetooth beacon and reverse RFID systems as potential tools for measuring truck travel time in open-pit mines: a simulation experiment

被引:9
作者
Baek, Jieun [1 ]
Choi, Yosoon [1 ]
Lee, Chaeyoung [1 ]
Jung, Jihoo [2 ]
机构
[1] Pukyong Natl Univ, Dept Energy Resources Engn, Busan, South Korea
[2] Korea Inst Energy Res, Global R&D Strategy Team, Daejeon, South Korea
基金
新加坡国家研究基金会;
关键词
Bluetooth beacon; reverse RFID; open-pit mine; truck travel time; optimal haulage system;
D O I
10.1080/12269328.2017.1370616
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
We compared the performance of a Bluetooth beacon system and a reverse Radio-Frequency Identification (RFID) system to investigate their potentials as tools for measuring truck travel time in open-pit mines. A university campus was chosen as the simulation experiment site, and Bluetooth beacons and RFID tags were installed at intervals along the car's course. A car equipped with a smartphone that can recognize beacons and an RFID reader that can communicate with the tags was driven along the course; the travel time and recognition rate were measured. For comparison of the travel time measurement data, we used video data captured while driving the car. The analysis results of ten rounds of experimental measurement data show that the average time error is 1.14 and 0.80 s for the Bluetooth beacon and reverse RFID systems, respectively. The sensor recognition rate is an average of 98% for the Bluetooth beacon system and 61% for the reverse RFID system. The reverse RFID system is slightly more accurate as a tool for measuring car travel time, and the Bluetooth beacon system has a much better sensor recognition rate.
引用
收藏
页码:43 / 52
页数:10
相关论文
共 29 条
[1]  
Alarie S., 2002, INT J SURFACE MINING, V16, P59, DOI [10.1076/ijsm.16.1.59.3408, DOI 10.1076/IJSM.16.1.59.3408]
[2]  
Asi B., 2004, P 13 INT S MIN PLANN, P585
[3]   An enumeration algorithm for solving the fleet management problem in underground mines [J].
Beaulieu, M ;
Gamache, M .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (06) :1606-1624
[4]  
Blackwell GH, 1999, CIM BULL, V92, P143
[5]  
Bonates E. J. L., 1996, MINE PLANNING EQUIPM, P51
[6]   Introducing GPS in fleet management of a mine: Impact on hauling cycle time and hauling capacity [J].
Chaowasakoo, Patarawan ;
Leelasukseree, Cheowchan ;
Wongsurawat, Winai .
International Journal of Technology Intelligence and Planning, 2014, 10 (01) :49-66
[7]   Improving fleet management in mines: The benefit of heterogeneous match factor [J].
Chaowasakoo, Patarawan ;
Seppala, Heikki ;
Koivo, Heikki ;
Zhou, Quan .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 261 (03) :1052-1065
[8]  
정지후, 2016, [TUNNEL AND UNDERGROUND SPACE, 터널과 지하공간], V26, P253
[9]  
정지후, 2015, [Journal of the Korean Society of Mineral and Energy Resources Engineers, 한국자원공학회지], V52, P422
[10]  
박세범, 2014, [TUNNEL AND UNDERGROUND SPACE, 터널과 지하공간], V24, P111